Laserfiche WebLink
<br /> <br /> <br />There is a desire to see additional partnership between the City, Galilee Lutheran Church and <br />Armory to provide meeting and recreation space for the community. Currently there are no <br />programmed recreation field games at the Armory site. <br /> <br />Parks and Recreation System Plan is part of the Comprehensive Guide Plan that guides the <br />development of the Park and Recreation system in the City of Roseville. Park and Recreation <br />guidelines have been developed in this plan to provide a framework for decisions by city <br />officials. <br /> <br />Properly located, park and open space lands can control flooding, help to preserve the quality of <br />the surface water, replenish the ground water supply, reduce air pollution and preserve natural <br />resources. Parks also serve as gathering centers for active and passive use, providing a focus in <br />many neighborhoods. They can be used effectively to maintain a "buffer" between conflicting <br />land uses and to beautify the community by linking civic facilities such as schools and parks. <br /> <br />Two types of Roseville parks could be considered for the Armory open space areas: <br /> <br />.Play Lots (PL) <br />Play lots are small parks intended for informal recreation, play and relaxation. <br /> <br />. Neighborhood Parks (NP) <br />Neighborhood parks offer opportunities for a variety of recreational activities, <br />both organized and informal. <br /> <br />While the Park & Recreation Plan and system statement were originally developed in 1996 and <br />revised in 2001, they are current and reviewed periodically. The Plan is formally reviewed and <br />revised at least every five years. Page 14 of the City of Roseville Park System Plan recommends <br />that the City should, at the McCarrons Lake National Guard Armory, acquire the land north of <br />the buildings, and should review a possible agreement in December of 2003. <br /> <br />19. Projected Timing and Phases of Redevelopment <br /> <br />To explain the recommended future uses in the study area, staff split the area into three phases of <br />development. Phase I and II could happen simultaneously as property owners (Guptil, others) <br />are anxious to redevelop their sites and there is a need to renovate residential properties within <br />the study area. Phase III is long term (10 to 20 years) and includes the complete redevelopment <br />of the apartment buildings and business along Rice Street. <br /> <br />19.1 Phase I Development - 2-5 year plan <br /> <br />The phase I area is a total of approximately 14 acres and includes the 185 N. McCarrons - Guptil <br />Site, the 9.2 acre Armory site and the 2.4 Acre Church site. (Refer to Appendix E.l. and E.2. for <br />Existing Aerial Contour Maps of the Phase I area). Phase I of the Plan is the highest priority <br /> <br />Final Version <br /> <br />16 <br /> <br />July 26, 2004 <br />