Laserfiche WebLink
<br /> <br />western <br /> <br />area. <br /> <br />F. Visitor/customer parking being located in the 11 on-site parking spaces along the <br />south side of the building adjacent to the entry. <br /> <br />G. Employee parking being restricted to the western parking area and those spaces <br />north of the shop entrance. <br /> <br />H. The trash enclosure being constructed of similar materials as that of the principal <br />structure and placed on the site in a suitable location. Because of the weight of <br />the dumpster when filled with discarded glass, its design and location must be <br />screened but may eliminate the roof and be detached from the principal structure. <br /> <br />I. The building being comprised of integral colored rock faced masonry units with <br />banding accentuation, pre-finished metal trim, and metal or aluminum windows, <br />as per the plans submitted on June 3, 2004. <br /> <br />J. Review and approval of the utility, grading, and driveway accesses by the <br />Roseville Public Works Department and stonn water drainage plan for the site by <br />the Rice Creek Watershed. <br /> <br />K. The structure being limited to a maximum height of 3 stories. <br /> <br />L. Signage and site lighting meeting the requirements of Section 1009 and 10 10 of <br />the Roseville City Code respectively. <br /> <br />7.0 PLANNING COMMISSION ACfION: <br /> <br />7.1 On July 7, 2004, the Roseville Planning Commission held the public hearing regarding <br />the Ellison request. At the hearing one resident did address the Commission asking <br />whether Mr. Ellison discussed the redevelopment with the home owners (yes) <br /> <br />7.2 The Commission voted (6-0) to recommend approval of the REZONING and <br />COMDITIONAL UES PERMIT request, based on the findings of Section 5 and <br />conditions of Section 6, of the project report dated July 7,2004. <br /> <br />PF3582 ReA - 072604 Page 7 of 8 <br />