Laserfiche WebLink
<br /> <br />was <br /> <br /> <br /> <br />a <br /> <br /> <br />were <br /> <br />were <br /> <br /> <br />introduced the <br /> <br />and moved <br /> <br />RESOLUTION NO. 10253 <br />A RESOLUTION APPROVING THE VACATION OF A PUBLIC UTILITY & <br />DRAINAGE EASEMENT WITHIN APPLEWOOD POINTE OF ROSEVILLE (PF3602). <br /> <br />WHEREAS, United Properties has requested the vacation of a utility and drainage <br />easement dedicated with the original Applewood Pointe of Arona subdivision in 2003; and <br /> <br />WHEREAS, the easement is located on property legally described as: <br /> <br />the South 27.11 feet of the West 48.00 feet of the East 55.00 feet of Outlot "A", Applewood <br />Pointe of Arana 2nd Addition <br /> <br />WHEREAS, the Public Works Department has determined that the requested utility & <br />drainage easement is no longer necessary for public infrastructure; and <br /> <br />WHEREAS, the Roseville Planning Commission held a public hearing regarding the <br />Easement Vacation request and voted (5-0) to recommend approval its vacation, based on the <br />findings of Section 5.10 to 5.12 and the condition of Section 8 of the project repot dated October <br />14,2004; <br /> <br />NOW THEREFORE BE IT RESOLVED, by the Roseville City Council, to grant the <br />VACATION a UTILITY & DRAINAGE (as described above) to <br />Properties based on the findings in Section 5.10 to 5.12 of the project report dated October 25, <br />2004, and subject to the following conditions: <br /> <br /> <br />1. The provision of a 10 foot wide storm sewer force main easement on the south <br />property line, a pathway easement, and an easement for the public overlook. <br /> <br />2. The relocation of the proposed retaining wall outside of the storm sewer force <br />main easement. <br /> <br />3. A revised landscape plan to include a decorative fence and landscaping that will <br />screen and separate the town homes from the public path. <br /> <br />1 <br />