My WebLink
|
Help
|
About
|
Sign Out
Home
2015-02-03_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2015
>
2015-02-03_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2015 10:27:25 AM
Creation date
2/6/2015 10:27:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Progress Report: Roseville Natural Resources Restoration Projects* <br /> (1.26.15) <br />RESTORATION TYPE/ACTIVITY <br />ParkWoodlandPraire/SavannaShorelineStreamWetlandGraphic Design <br />Native seeding of grasses/flowersNative seeding of grasses/flowers <br />Initial cut/treat of invasive woody <br />Interpretive signage planning <br />Native seeding/Planting of Native seeding/Planting of Native seeding/Planting of <br />Initial treat of vegetation <br />Survey/data gatheringSurvey/data gathering <br />Hydrologic restoration <br />Grow-in maintenanceGrow-in maintenanceGrow-in maintenanceGrow-in maintenanceGrow-in maintenance <br />Manufacture/install <br />Site preparationSite preparationSite preparation <br />grasses/flowersgrasses/flowersgrasses/flowers <br />Graphic Design <br />Acorn Park 80%80%P100%50%PNANANANANANANA100%80%PPP <br />Central Park Dale East 50%50%PPP PNANANANANANANANANANANANA <br />Central Park Lexington 50%50%PPPP80%PPNANANANANANANANANA <br />100%80%35%NANANA100%100%0.35NANANANA100%100%PPP <br />Langton Lake Park <br />Owasso Hills (NC)PPPPPPNANANANANANANANAPNAPP <br />Oasis Park NANANANANANA100%100%15%5%PPPNANANANANA <br />Reservoir Woods 5%5%5%PPPNANANANANANANANAPPPP <br />100%50%PNANANANANANANANANANA100%20%PPP <br />Villa Park <br />Willow Pond Park NANANANANANA80%PPNANANANANANANANANA <br />Interpretive signage NANANANANANANANANANANANANANANANANANA10%PP <br />key: xx%=percent complete; P = pending work, NA = Not applicable/work type not planned for this park; NC = Non-core project <br />*Additional, non-core projects may be added as additional grant funding is secured <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.