Laserfiche WebLink
<br /> <br /> <br />must <br /> <br />Need <br /> <br /> <br />to <br /> <br />to <br /> <br /> <br />3 to 5 <br /> <br /> <br />Estimate 30,000 s.f. up to 60,000 s.f manufacturing\warehouse footprint 60,000 <br />Estimate 60,000 footprint, 215 office workers, 100 production\warehouse <br /> <br />Assume one shift, 315 employees maximum. <br />Assume 5 per 1000 s.f. office\training (40,000 s.f.) parking (200 spaces); <br />Assume 2 per 1000/s.f. production/warehouse (30,000 s.f to 60,000s.f.) parking (60-120 spaces) <br />Assume 320 parking spaces maximum at 300 s.f. per space = 96,000 s.f. or 2.2 acres. <br />Assume 30% green space\setbacks = 4.0 to 5.0 acres minimum. <br /> <br />Minimum height: 16 feet clear; 3 exclusive loading docks, some by semi truck <br /> <br />Site plan to include l/Sth scale drawing of space <br /> <br />Satellite and back up generator (450KW diesel) required <br /> <br />EAS 1 and EAS 2 must be shared if available. <br /> <br />Possible Sites (based on current zoning): <br /> <br />Liberty Check\Health Care Building, Liberty builds new building <br /> <br />Veritas 1; Veritas builds new Phase 3 building <br /> <br />Dorso Site; 5 acre "Secure" site, with 5 acres for additional business site <br /> <br />Hand W site (6 acres) <br /> <br />Hagen Metro-Recyling site, 2785 Fairview (5 acres) <br /> <br />Meritex Triangle at Terminal and Walnut (6 acres) <br /> <br />Reiling B-2 site at Old 8 and County Road D <br /> <br />ACI\Honeywell\St. Paul Properties site on Terrace Drive (5 acres with 110,000 s.f. vacant <br />building on site) <br /> <br />2 <br />