My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03614
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3600
>
pf_03614
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 2:38:09 PM
Creation date
6/6/2006 3:23:37 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3614
Planning Files - Type
Planning-Other
Status
Non-Active
Additional Information
Secure Computing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />5) <br /> <br /> <br />be provided as <br /> <br /> <br />code; <br /> <br />Fire <br /> <br /> <br />as required code <br /> <br /> <br />state; <br /> <br />Exit signs and emergency <br />code; <br /> <br /> <br />packs) as required per <br /> <br />8) Passenger elevator lobby complete <br />finishes; <br /> <br />respects including <br /> <br />9) Core corridor doors finished; <br /> <br />10)Stairwell doors finished; <br /> <br />11 )Stairwells between floors seNing Tenant will have walls and <br />railings finish painted. Such stairwells will be lighted to 35 foot <br />candles minimum; <br /> <br />12)Closers and appropriate locking devices for all exit, stairwell, <br />electrical/telephone doors, and women1s/men's toilets. Stairwell <br />doors will have locking and unlocking devices controlled by <br />Landlord's building management system, Landlord will also <br />provide an electronic card access security system as approved <br />by Tenant on all stairwell doors on each of T enant's floors. Access <br />system will be designed with extra points to accommodate <br />Tenant's system; <br /> <br />13)AII ceiling space will be sufficiently clear of all pipes, ductwork, <br />etc" to provide for a minimum finished ceiling height of nine (9) <br />feet. All base building systems will be coordinated such that the <br />intersection of the building structural system, medium pressure <br />ductwork, the fire protection system and the base building light <br />fixture will all fit within the ceiling cavity. Indicated heights will <br />include room to place conventional florescent light fixtures to <br />properly illuminate the work space; <br /> <br />14)AII penetrations will be packed airtight and complete; <br /> <br />15)Domestic cold water, valved and capped at one location per <br />floor; <br />
The URL can be used to link to this page
Your browser does not support the video tag.