My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03616
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3600
>
pf_03616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 2:38:22 PM
Creation date
6/6/2006 3:59:54 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3616
Planning Files - Type
Interim Use Permit
Address
2880 WALNUT ST
Applicant
Shafer Contracting
Status
Approved
PIN
082923320001
Date Final City Council Action
12/28/2005
Planning Files - Resolution #
10281
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />PROJECT: <br /> <br /> <br />SHAFER PIT <br />12500 RICH VALLEY BOULEVARD <br />ROSEMOUNT, MINNESOTA <br /> <br />SHAFER CONTRACTING. INC. <br />P.O. BOX 128 <br />SHAFER. 55074 <br /> <br />A TTN: SCOTT SPISAK <br /> <br />AET JOB. NO. 20-04834 <br /> <br />DATE: DECEMBER 15. 2004 <br /> <br />INTRODUCTION <br /> <br />This report presents the results of the vibration monitoring services we recently performed at the <br />referenced site in Rosemount, Minnesota. The scope of our work included the following: <br /> <br />. Perform vibration monitoring at select distances from the primary and secondary rock <br />crushing activities. <br />. SunIDlarize the results of our services in a written report. <br /> <br />Our <br /> <br />on this <br /> <br />was authorized by Mr. Scott Spisak of Shafer Contracting Co., Inc., <br /> <br />(Shafer), on November 30, 2004. <br /> <br />BACKGROUND INFORMATION <br /> <br />The Shafer pit is located at 12500 Rich Valley Boulevard in Rosemount, Mimlesota. Current <br />activities within the gravel pit include recycling of concrete and other construction related <br /> <br />Il1aterials. This recycling is conlpleted by routillg t11e material t11foug11 a prin1ary rock crus11er and <br /> <br />a secondary rock crusher. Shafer indicated that future recycling projects using this method may <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.