My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03616
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3600
>
pf_03616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 2:38:22 PM
Creation date
6/6/2006 3:59:54 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3616
Planning Files - Type
Interim Use Permit
Address
2880 WALNUT ST
Applicant
Shafer Contracting
Status
Approved
PIN
082923320001
Date Final City Council Action
12/28/2005
Planning Files - Resolution #
10281
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />ITEM NO: 5a <br /> <br />Department Approval: <br />TP jDPW <br /> <br />Agenda Section <br />PUBLIC HEARING <br /> <br />I tern Description: <br /> <br />Request by Shafer Contacting Co., Inc. for an INTERIM USE PERMIT <br />to allow for the temporary creation of a concrete recycling area on a <br />portion of the Meritex parcel, 2880 Walnut Street (PF3616). <br /> <br />1,0 REQUESTED ACTION: <br /> <br />1.1 Shafer Contracting seeks approval of an INTERIM USE PERMIT in accordance with <br />Section 1012.09 of the Roseville City Code to allow establishment of a temporary <br />concrete recycling (crushing, storage, batch mixing, and delivery) area on a triangular <br />piece of vacant property located east of the Meritex building (2880 Walnut Street) and <br />directly adjacent to Terminal Drive (north) and the Minnesota Commercial rail line <br />(east), The temporary use would begin in April 2005 and extend to August 2006 (or <br />earlier) for completion of concrete work associated with the County Road Reconstruction <br />project. <br /> <br />PROJECT REVIEW HISTORY: <br /> <br />· Revised Application Received: Oll06/05. <br />· Determined Complete: 0 l/06/05. <br />· 60 Day Review Deadline: 03/7/05 <br />. Project Report Recommendation: Approval 02/02/05, <br />· Anticipated City Council Action: 2/24/05, <br /> <br />2.0 SUMMARY of RECOMMENDATION: <br /> <br />2.1 The Community Development Department recommends APPROVAL of the INTERIM <br />USE PERMIT for Shafer Contracting. <br /> <br />3.0 SUGGESTED PLANNING COMMISSION ACTION: <br /> <br />3.1 BY MOTION Recommend APPROVAL of the INTERIM USE PERMIT (see <br />Section 7 for detailed action). <br /> <br />PF3616]PCA_020205.doc\ Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.