My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03621
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3600
>
pf_03621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 2:38:50 PM
Creation date
6/7/2006 9:13:46 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3621
Planning Files - Type
Variance
Address
3117 OWASSO BLVD W
Applicant
Daniel Stemm
Status
Approved
PIN
022931110030
Date Final Variance Board Action
1/5/2005
Planning Files - Resolution #
11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Mr. Thomas Paschke <br />City Planner <br />Roseville Community Development Department <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br /> <br />RE: Request for variance approval extension <br /> <br />Dear Thomas, <br /> <br />In January of 2005 I was provided a variance to the Roseville city code allowing the construction of an <br />accessory building to the front of my primary residence. When this variance was granted I was <br />allowed six months to request a building permit before expiration. <br /> <br />Since January I further detailed the structure plans and began the process of selecting a contractor <br />for the project. This process consumed more time than anticipated. I have had difficulty locating a <br />contractor that is willing and able to consider the unique nature of this project and yet accept the <br />project due to its smaller scope at being only 626 square feet. <br /> <br />This challenge combined with an extensive travel schedule having me in Asia one to two weeks a <br />month since January has me yet to determine a contractor. I have however now been able to identify <br />(3) different firms willing and capable of the project who will be submitting bids over the next 4-6 <br />weeks allowing me to select the group for the project. <br /> <br />After this selection I will yet need to complete the building design, develop the structural prints and <br />schedule the project before applying for the permit. Due to this schedule I would like to request an <br />additional (6) month extension to the original variance. <br /> <br />Thank you for your consideration and should you have any questions please contact me via e-mail at <br />dstemm@reell.com since I will again be in Korea, China and Taiwan from May 18-28, 2005. <br /> <br />Sincerely, <br /> <br /> <br />I <br />wasso BLVD West <br />MN 55113 <br /> <br />651 330 7842 <br />
The URL can be used to link to this page
Your browser does not support the video tag.