<br />first
<br />centers: the Don Owen Center and the McGee
<br />skateboard constmcted in In order to calculate the Clment cost of these
<br />historic constmction costs were to 2003 dollars, as shown in Table 26,
<br />
<br />
<br />Table 26
<br />
<br />SPORTS CENTER COST
<br />
<br />Facility
<br />Year
<br />Built
<br />Original
<br />Cost
<br />Cost
<br />Factor
<br />CUITcnt
<br />Cost
<br />Don Owen Sports Center 1994 S 1,938,295 .228 S2.380,226
<br />McGee Sports Center 2000 S3,500,000 1.067 S3,734,500
<br />Skateboard Park 2002 S75,000 1.016 S76,200
<br />Total, Sports Centers S6,190,926
<br />Original and )'ear built from Conway Parks and Recreation
<br />memorandum; cost factor based on Engineering
<br />from ww\v.enr.cOnl.
<br />
<br />
<br />December 03,
<br />Cost Index for
<br />
<br />The inventory of existing park improvements, other than the sports centers, is presented in the
<br />Appendix, Multiplying the number of facilities by the current unit cost of each facility and summing
<br />yields the estimated replacement cost for the City's existing park facilities, as summarized in Table
<br />27. The replacement cost of existing park land based on the conservative cost assumption of
<br />per acre is also included in Table 27,
<br />Conway\Road and Park Impact Fcc Study April 15. 2003 DRAFT. Page 24
<br />
<br />
<br />Table 27
<br />P ARK REPLACEMENT COST
<br />Park Systcm Componcnt lJnits Cost/Unit Total Cost
<br />Park land (acres) 289.5520,000 S5,790,000
<br />Sports Centers na na S6,190,926
<br />Baseball Backstop 2 S10,000 S20,000
<br />Baseball Field, lighted 1 S 132.500 S132,500
<br />Basketball Goal 15 Sl,200 S]8,000
<br />Basketball Goal, lighted 2 S42,000 S84,000
<br />Bench 39 S275 SI0.725
<br />Bleachers, 25 People 18 SI,304 S23,472
<br />Bleachers, 50 People 3 S2,300 S6,900
<br />Boat Dock 2 52,000 S4,000
<br />Boat Ramp 2 S2.000 S4,000
<br />Caretakers House 1 S60,000 S60,000
<br />Crawl Tunnel 2 S700 S 1,400
<br />Dumpster, Three Yard 8 S435 53,480
<br />Dumpster, Six Yard 4 S640 S2,560
<br />Fishing Pier S99,093 S99,093
<br />Grill 19 S200 S3,800
<br />MelTy-Go-Round I S 1,2005 1,200
<br />Bars 5 I ,00053.000
<br />Parkmg, Car I,OM 5460 $489,440
<br />Parking, Boat & Trailer 65 5460 529,900
<br />Pavilion, Small 2 514,000528,000
<br />Pavilion, large 6 $22,000 SI32,OOO
<br />Picnic Table 74 5475 535,150
<br />Play Center, Medium 2 $ 13,000 526,000
<br />Play Center, large 2 S18,500 $37.000
<br />Pump House 3 $2,500 57,500
<br />Restroom 7 530,000 S21O,000
<br />Rocking Animal 5 $450 S2,250
<br />
|