Laserfiche WebLink
<br />first <br />centers: the Don Owen Center and the McGee <br />skateboard constmcted in In order to calculate the Clment cost of these <br />historic constmction costs were to 2003 dollars, as shown in Table 26, <br /> <br /> <br />Table 26 <br /> <br />SPORTS CENTER COST <br /> <br />Facility <br />Year <br />Built <br />Original <br />Cost <br />Cost <br />Factor <br />CUITcnt <br />Cost <br />Don Owen Sports Center 1994 S 1,938,295 .228 S2.380,226 <br />McGee Sports Center 2000 S3,500,000 1.067 S3,734,500 <br />Skateboard Park 2002 S75,000 1.016 S76,200 <br />Total, Sports Centers S6,190,926 <br />Original and )'ear built from Conway Parks and Recreation <br />memorandum; cost factor based on Engineering <br />from ww\v.enr.cOnl. <br /> <br /> <br />December 03, <br />Cost Index for <br /> <br />The inventory of existing park improvements, other than the sports centers, is presented in the <br />Appendix, Multiplying the number of facilities by the current unit cost of each facility and summing <br />yields the estimated replacement cost for the City's existing park facilities, as summarized in Table <br />27. The replacement cost of existing park land based on the conservative cost assumption of <br />per acre is also included in Table 27, <br />Conway\Road and Park Impact Fcc Study April 15. 2003 DRAFT. Page 24 <br /> <br /> <br />Table 27 <br />P ARK REPLACEMENT COST <br />Park Systcm Componcnt lJnits Cost/Unit Total Cost <br />Park land (acres) 289.5520,000 S5,790,000 <br />Sports Centers na na S6,190,926 <br />Baseball Backstop 2 S10,000 S20,000 <br />Baseball Field, lighted 1 S 132.500 S132,500 <br />Basketball Goal 15 Sl,200 S]8,000 <br />Basketball Goal, lighted 2 S42,000 S84,000 <br />Bench 39 S275 SI0.725 <br />Bleachers, 25 People 18 SI,304 S23,472 <br />Bleachers, 50 People 3 S2,300 S6,900 <br />Boat Dock 2 52,000 S4,000 <br />Boat Ramp 2 S2.000 S4,000 <br />Caretakers House 1 S60,000 S60,000 <br />Crawl Tunnel 2 S700 S 1,400 <br />Dumpster, Three Yard 8 S435 53,480 <br />Dumpster, Six Yard 4 S640 S2,560 <br />Fishing Pier S99,093 S99,093 <br />Grill 19 S200 S3,800 <br />MelTy-Go-Round I S 1,2005 1,200 <br />Bars 5 I ,00053.000 <br />Parkmg, Car I,OM 5460 $489,440 <br />Parking, Boat & Trailer 65 5460 529,900 <br />Pavilion, Small 2 514,000528,000 <br />Pavilion, large 6 $22,000 SI32,OOO <br />Picnic Table 74 5475 535,150 <br />Play Center, Medium 2 $ 13,000 526,000 <br />Play Center, large 2 S18,500 $37.000 <br />Pump House 3 $2,500 57,500 <br />Restroom 7 530,000 S21O,000 <br />Rocking Animal 5 $450 S2,250 <br />