My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03626
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3600
>
pf_03626
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 2:39:47 PM
Creation date
6/12/2006 10:09:40 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3626
Planning Files - Type
Variance
Address
1765 DALE ST N
Applicant
Ralph Beauclaire
Status
Approved
Date Final City Council Action
5/25/2005
Planning Files - Resolution #
10294
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1 <br /> <br /> <br />a <br /> <br />public right-of-way, a 110 foot <br /> <br />WHEREAS, Section 1013 ofthe City Code grants the Variance Board authority to <br />review/approve appropriate variances in accordance with the Code requirements, and MS <br />462.357, subd 6(s) provides authority for the city to hear and grant requests for variances under <br />certain circumstances; and <br /> <br />WHEREAS, the Planning Commission on April 6, 2005, held a hearing on the Beauclaire <br />variance and subdivision requests. One neighbor was present to support the subdivision but to <br />caution about the private sewer and pumping systems. He recommended a new city sewer line as <br />an alternative. The Planning Commission recommended approval of the variances and <br />subdivision 6-0 based on the findings in Section 5 of the project report and subject to the <br />conditions within Section 6 of the project report dated April 6, 2005, and including payment of <br />park fee by applicant (if required after attorney review) and, if requested on the new parcel, side <br />yard variances will be required rather than setback permits. <br /> <br />WHEREAS, based on findings as outlined in Section 5 of the project report dated April <br />25,2005, the Community Development Staff recommends approval of the variance requests, and <br />subject to the conditions outlined in Section 6 of the project report dated April 25, 2005; <br /> <br />a. The City policy is to require payment of the Metro Area Sewer Availability <br />Charge (SAC) upon the issuance ofa building permit. In this case, a $1,350 SAC <br />fee is required and will be collected with the issuance of a building permit for <br />Parcel "A". <br /> <br />b. The applicant must record the two lot minor subdivision survey within 60 days <br />after the approval of the City Council. Public utility and drainage easements of 5 <br />feet are required on the sides and rear lot line, while a 10 feet right of way <br />easement is required on the east Dale Street frontage. In addition, a private utility <br />easement across parcel B in favor of Parcel for private sanitary sewer placement <br />must be recorded with the survey. <br /> <br />c. The applicant must apply for and receive a driveway access permit for Ramsey <br />County prior to issuance of any building or grading permit. <br /> <br />d. A grading plan and the survey ("B" above) must be submitted with the building <br />permit application. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.