Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br />shall to a <br />certifying that grading project was constructed and was completed as depicted <br />approved grading prior to the issuance of a Certificate Occupancy (Exhibit D). <br /> <br /> <br />property <br />prior to <br /> <br />to construction is <br />or building permits are issued, an erosion control plan must be submitted for approval <br />the Director of Public Works and all erosion control actions shall be implemented, <br />inspected approved the CITY (Exhibit <br /> <br /> <br />8.4 Clean Up. DEVELOPER shall clean dirt and debris from streets that has resulted <br />from construction work by said DEVELOPERS, its agents or assigns. The CITY <br />determine whether it is necessary to take additional measures to clean dirt and debris <br />from the streets. After hours verbal notice to the developer, the may complete or <br />contract to at <br /> <br /> <br />8.5 Utility & Drainage Easements. The DEVELOPER must provide a utility and drainage <br />easement which is required around the periphery of the project parcel and which must <br />ten-feet in width. The DEVELOPER must also provide a utility and drainage easement <br />over all public infrastructure and as determined by the Public Works Department. <br /> <br />8.6 Perpetual Access and Use Easement. The DEVELOPER must record a perpetual access <br />and use easement over the private drive and driveway aprons, which easement allows <br />each property owner, their heirs, assigns, and others use of the private access and drive <br />lane. <br /> <br />8.7 Park Dedication. The DEVELOPER is responsible for provision of a payment in lieu of <br /> <br />4 <br />