Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: February 24, 2015 Item No: 4 <br />Item Description: Communication Items <br />Projects update: <br />• Snelling Ave Bus Rapid Transit: This project is still on schedule for a 2015 construction <br />timeline with actual bus operations beginning in the end of 2015. <br />• Victoria Street Reconstruction and Sidewalk Project: The City Council is holding a <br />Public Hearing on Monday, February 23`d to consider the proposed public improvements <br />along Victoria Street including the installation of a pathway along the east side of the <br />roadway. Staff will give a quick update on the outcome of the Council's consideration <br />and any significant issues raised by the Council or residents. <br />• TH 36 Bridge Replacement at Lexington Ave: Staff continues to work with the <br />Minnesota Department of Transportation on the design of the bridge replacement project. <br />Plans are well underway and Mn/DOT intends to advertise for bids this fall. <br />• Some minor updates have been made to the 2015 Street/Pathway Project Map to reflect <br />the removal of the Gluck Lane area from the Pavement Management Program for 2015 so <br />that the watermain along Gluck Lane can be replaced in 2016 instead of this year which <br />allows us to better manage the water utility fund expenses. <br />Maintenance Activity: <br />• Street maintenance staff is providing winter snow and ice control as necessary, boulevard <br />tree trimming, and sign maintenance as well as other preventative equipment <br />maintenance. <br />• Utility crews have been busy with occasional water main breaks and other normal <br />seasonal maintenance activity. Frost levels are at 4.5 -5 feet which is normal for this time <br />of year. <br />Solar Update: <br />The City Council authorized the application for Made in Minnesota Solar Credits Program for <br />possible installation of two 40KW Solar PV rooftop systems. A letter of intent has been signed <br />with TruNorth Solar to submit the applications on the city's behalf. We believe the results of the <br />lottery drawing for funding will be available in April. <br />Staff also recently met with Minnesota Community Solar to discuss their business model to <br />develop solar subscription projects in this area They have developed two solar 500KW projects <br />that are fully subscribed in Minneapolis. They only develop projects that are 250KW or larger <br />and currently do not have a project available to Roseville residents for subscription. They <br />indicated a subscriber can typically save 10-15% on their electric energy bill. They are looking <br />for large rooftops and community partners for future projects. <br />