My WebLink
|
Help
|
About
|
Sign Out
Home
2015-02-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2015
>
2015-02-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2015 4:15:18 PM
Creation date
2/19/2015 4:11:33 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/24/2015
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Marc Culver, PE <br />City of Roseville <br />Existing Conditions <br />February 12, 2015 <br />Page 3 <br />The existing conditions were reviewed to establish a baseline to compare future conditions. The <br />evaluation of existing conditions includes peak hour intersection turning movement counts, field <br />observations, and an intersection capacity analysis. <br />Data Collection <br />Recently collected weekday p.m. peak period turning movement counts were reviewed at the <br />following study intersections: <br />• County Road C and Cleveland Avenue <br />• County Road C and Prior Avenue <br />• County Road C and Fairview Avenue <br />• County Road C and Lincoln Drive <br />• County Road C and Snelling Avenue <br />• Twin Lakes Parkway and Mount Ridge Road <br />• Cleveland Avenue and NB I -35W Ramps/Twin Lakes Parkway <br />• Fairview Avenue and Terrace Drive <br />• Snelling Avenue and County Road C2 <br />• Snelling Avenue and Lydia Avenue <br />Weekday p.m. peak period turning movement were collected by SRF on Thursday, January 22, 2015 <br />at the remaining study intersections: <br />• Cleveland Avenue and Iona Lane <br />• Cleveland Avenue and County Road C2 <br />• County Road D and NB I -35W Ramps <br />• County Road D and Cleveland Avenue <br />• County Road D and Fairview Avenue/New Brighton Road <br />• Fairview Avenue and Lydia Avenue <br />Observations <br />Field observations were completed to identify roadway characteristics within the study area (i.e. <br />roadway geometry, posted speed limits, and traffic controls). <br />• Cleveland Avenue is primarily a four -lane undivided roadway with a posted speed limit of <br />40 miles per hour (mph). <br />• Fairview Avenue is a four -lane undivided roadway south of County Road C2 and a two- <br />lane undivided roadway north of County Road C2 with a posted speed limit of 40 mph. <br />
The URL can be used to link to this page
Your browser does not support the video tag.