Laserfiche WebLink
Marc Culver, PE <br />City of Roseville <br />February 12, 2015 <br />Page 24 <br />• Results of the existing operations analysis indicate that all study intersections currently <br />operate at an acceptable overall LOS D or better during the p.m. peak hour with the existing <br />geometric layout and traffic control, except along County Road C at the Lincoln Drive and <br />Snelling Avenue intersections, which operate at LOS F. <br />o To mitigate this situation, modifications are necessary to the at grade intersections along <br />Snelling Avenue or additional capacity is needed along the Snelling Avenue corridor. <br />• SRF worked with City staff to develop a year 2030 land use plan in the study area. Trip <br />generation estimates for both the current and future land uses were developed for the p.m. <br />peak hour and on a daily basis using the HE Tri Generation Manual, 9tb Edition. <br />o Assuming that the existing land uses generate at the average ITE trip rate, an additional <br />2,965 p.m. peak hour and 31,707 daily trips will be generated in the Twin Lakes Study <br />Area under year 2030 full build conditions. <br />• The Metropolitan Council regional travel demand model was used to develop average daily <br />traffic (ADT) volumes for the greater adjacent roadway network, directional distribution for <br />the p.m. peak hour trip generation estimates, and to estimate the potential for a subregional <br />travel pattern shift with the extension of Twin Lakes Parkway to Fairview Avenue (i.e. non - <br />Twin Lakes area development trips diverting to Twin Lakes Parkway). <br />• Results of the year 2030 analysis indicate that there will be operational issues during the p.m. <br />peak hour for all three scenarios under year 2030 conditions. <br />• To improve operations, the following improvements should be considered. <br />o County Road D and Fairview Avenue/New Brighton Road (all Scenarios) <br />• Traffic control modification is recommended at this intersection. Further review is <br />needed to determine proper traffic control, such as installation of a traffic signal or <br />roundabout. <br />• Construct or clearly delineate a northbound through/right turn lane. <br />o Cleveland Avenue and County Road C2 <br />• This intersection should be monitored as development occurs to ensure proper <br />traffic control is installed. <br />o Fairview Avenue and Lydia Avenue <br />• This intersection should be monitored under future conditions. If operational issues <br />occur consider installation of a traffic signal or roundabout. <br />o Snelling Avenue <br />• Modifications are necessary to the at -grade intersections along Snelling Avenue or <br />additional capacity is needed along the Snelling Avenue corridor to mitigate the <br />capacity issues that are observed. If this does not occur it is anticipated that traffic <br />will divert to other routes, including regionally, subregionally, and locally. <br />