My WebLink
|
Help
|
About
|
Sign Out
Home
2015_0302_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_0302_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2015 2:32:31 PM
Creation date
2/26/2015 2:28:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
802.03: CONNECTION REQUIRED: <br />A. Existing Buildings: Any building used for human habitation and located on property <br />adjacent to a sewer main, or in a block through which the system extends, shall be <br />connected to the Municipal sanitary sewer system within two years from the time a <br />connection is available to any such property. <br />B. New Construction: All buildings constructed on property adjacent to a sewer main or <br />in a block through which the system extends shall be provided with a connection to <br />the Municipal sanitary sewer system for the disposal of all human wastes. <br />C. Senior Citizen Deferral: In cases where the owner of an existing building is receiving <br />a senior citizens deferral of special assessments for the cost of the sewer main and no <br />health hazard exists, the City Council may defer the requirement for a connection to <br />the sanitary sewer system until such time as the senior citizen deferral expires or a <br />health hazard exists. (Ord. 901, 3-10-82) <br />802.04: APPLICATION FOR SEWER CONNECTION: <br />A. Permit; Fees: Any person desiring a connection to the Municipal sanitary sewer <br />system for property not previously connected with the system shall make application <br />for a permit to the Chief Code Enforcement Officer, accompanied by such <br />information as required by the Chief Code Enforcement Officer, together with a <br />permit and inspection fee as set by City Council resolution; provided, however, that <br />a separate permit may be issued for that portion of the sewer connection extending <br />from the property line to the main sewer or other outlet for which permit the fee shall <br />be as set by City Council resolution and a separate permit may also be issued for that <br />portion of the sewer extending from the house or building to the property line for <br />which the permit fee shall be as set by City Council resolution. Inspection of the <br />sewer service from the main to the building shall be performed by the Chief Code <br />Enforcement Officer to ensure compliance to all applicable codes. (Ord. 1009, 3-23- <br />87; amd. 1995 Code) <br />B. Additional Building Permit Fees: In addition to the building permit fees established <br />in Section 901.06 and in addition to any other fees established in this Code there is <br />hereby established a fee to pay and reimburse the City for all sums which the City <br />shall be required to pay to the Metropolitan Council Environmental Services <br />Metropolitan Waste Control Commission because of all construction. <br />C. Additional Fees to Pay for Unassessed Property and to reimburse the City for <br />Metropolitan Council Environmental Services Metropolitan Sewer Board Charges: <br />The permit fee for connection to the City sanitary sewer system shall be paid for <br />each connection in the amount specified in subsections A and B of this Section. In <br />addition thereto, before any permit shall be issued, the following conditions shall be <br />complied with: <br />1. No permit shall be issued to connect with any sanitary sewer system of the City <br />directly or indirectly from any lot or tract of land unless the Public Works Director <br />shall have certified: <br />a. That such lot or tract of land has been assessed for the cost of construction of <br />the sanitary sewer main with which the connection is made; or <br />b. If no assessment has been levied for such construction cost, the proceedings for <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.