My WebLink
|
Help
|
About
|
Sign Out
Home
2015_0415_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_0415_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2015 2:24:23 PM
Creation date
4/9/2015 4:34:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTAC H M E N T C <br />Marion Street / The Brittanys <br />G � G Management, LLC <br />Council Members <br />City Of Roseville <br />Roseville City Hall <br />2660 Civic Center Drive <br />Apri16, 2015 <br />G& G Management is focused and proud to maintain all our buildings in good <br />condition, meeting or exceeding all applicable codes for the safety of our tenants & <br />office personnel. <br />G& G Management believe in protecting the environment, which directly relates to <br />the wellness and health of human beings and every other species. <br />We are proud that we have spent over $35K and saved 2,379,000 Gallons of water <br />over a 3 months period of July — Sep 2014 as compared to 3 months of July — Sep <br />2012, before improvements. California has water shortage at present & mandatory <br />cuts in water consumption. <br />We have replaced inefficient fluorescent lighting in the hallways & laundry rooms <br />with most eff'icient LED lamps, thus reducing electrical consumption. Reduction of <br />71,610 KWH/yr in electrical consumption will prevent 73,759 Kg of CO2 going into <br />atmosphere, thus helping "CLIMATE CHANGE" problem. (Assuming coal is used to <br />produce electricity) And it will reduce 22,975 Kg of CAR,BON going into atmosphere. <br />We know as per Mr. Don Munson, Codes Coordinator, Energy efficiency is not a <br />primary focus of the licensing program, we strongly believe & recommend <br />that it should be. <br />1. Management followed guidelines provided to us by City to correct all <br />items in every unit. Our intent was to fix everything and be ready <br />for inspection — <br />❑ Management inspected all units multiple times before inspection. <br />❑ Hired an electrician to go through all apartments, laundry rooms and <br />common areas to check/repair/replace every electrical issue, smoke <br />alarm, CO alarm, broken outlet/ switches. <br />❑ Hired a handyman to fix and/or replace all screens in all the buildings. <br />❑ Hired a paving company to install new 1735 Marion parking lot and <br />resurfacing an existing 195 Larpenteur parking lot. <br />❑ Inspected and fixed all concrete side walks. <br />❑ In 7 buildings installed new flooring in common areas like hallways, <br />stairways, and laundry room. <br />
The URL can be used to link to this page
Your browser does not support the video tag.