My WebLink
|
Help
|
About
|
Sign Out
Home
2015-03-03_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2015
>
2015-03-03_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2015 1:40:50 PM
Creation date
4/20/2015 1:38:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ROSEVILLE <br />PROJECT PROGRESS REPORT <br />FP41r[j2-&i95 9419 <br />PROJECT NAME <br />START <br />DATE <br />r STATUS <br />COMMENTS <br />A. BUILDING <br />REPLACEMENT/SITE <br />Lexington Park <br />S/2014 <br />96% complete <br />Open House completed - <br />Punch list items <br />remaining and spring site <br />work <br />Sandcastle Park <br />6/2014 <br />96% complete <br />Open House completed - <br />Punch list items <br />remaining and spring site <br />work <br />Villa Park <br />6/2015 <br />95% complete <br />Open House completed <br />January 28, 2015 .-.punch <br />list items and spring site <br />work <br />rry <br />ITdi ��V I��E E.M `�t„y�,}y <br />x`1ti�( �l 'j"•.� <br />C y r <br />T <br />�fEyrl{rr,d <br />B. SHELTER REMODEL <br />CP FOR Parks -- DALE STREET <br />9!2014 <br />95% complete <br />Fall completion planned <br />CP Foundation - WEST <br />9/2014 <br />100% complete <br />Fall completion planned <br />CP Ballfields <br />9/2014 <br />501/o complete <br />Fall completion planned <br />C. SKATING CENTER <br />REPAIRS <br />Painting of Exterior <br />8/2014 <br />100 % complete <br />Replace exterior doors on Arena <br />100% complete <br />Flock Work <br />201.5 project <br />'Vestibule Improvements <br />2015 pn�ject <br />D. HANG <br />Exterior Work <br />6/ 2014 <br />95% complete <br />Interior Work: <br />11/2014 <br />95% complete <br />Open House planned for <br />March 26, 2015 <br />Boardwalk <br />11/2014 <br />100% built- <br />moved to site to <br />install <br />Have mobilized and <br />begun installation as of <br />February 25, 2015 <br />E.`BRIDGE REPLACEMENT <br />Villa Park <br />7/2014 <br />5%o complete <br />Spring 2015 install <br />
The URL can be used to link to this page
Your browser does not support the video tag.