Laserfiche WebLink
HRA Meeting <br />Minutes – Tuesday, February 17, 2015 <br />Page 6 <br />1 <br />high as anticipated; therefore Western Bank could not commit to any further financing until <br />2 <br />sales of the townhomes were initiated. <br />3 <br />4 <br />Carolyn Olson, President of Greater Metropolitan Housing Corporation (GMHC) <br />5 <br />Ms. Olson advised that the prices for Phase II and III were something GMHC felt it could <br />6 <br />achieve; and once the townhomes were under construction and pre-marketing was underway, <br />7 <br />they anticipated once five were sold, the bank would be willing to move onto the next phase. <br />8 <br />Ms. Olson opined that the appraisal comparables were good and they could build to meet that <br />9 <br />market. <br />10 <br />11 <br />Mr. McNamara concurred with that scenario. <br />12 <br />13 <br />At the request of Chair Maschka, Ms. Olson advised that GMHC had not done any pre- <br />14 <br />marketing to-date as they did not yet have control of the site. <br />15 <br />16 <br />At the request of Member Wall, Mr. McNamara confirmed that he had read Attachment B <br />17 <br />entitled “Garden Station Design Proposal” to the staff report and that he was familiar with two <br />18 <br />GMHC projects done to-date. Mr. McNamara noted that the proposed rowhomes along Dale <br />19 <br />Street were similar to a project GHMC had done in the Riverside area, and provided <br />20 <br />comparable sales information, as well as another project they’d done along Theodore Wirth <br />21 <br />Parkway. Mr. McNamara advised that he was familiar with the numbers being used by <br />22 <br />GMHC, however, he noted that he needed to base his underwriting on appraisal standards, <br />23 <br />even though he felt the numbers were solid. <br />24 <br />25 <br />Member Wall opined that this appeared to him a rosy analysis, but in order to follow it, the <br />26 <br />HRA needed assurance that if the project went forward, Western Bank would also provide <br />27 <br />some assurances about their financial participation and commitment. <br />28 <br />29 <br />Mr. McNamara noted that everyone had considerable time and effort in this project, and if only <br />30 <br />looking at the six townhomes, there would be no problem. However, Mr. McNamara noted the <br />31 <br />uniqueness of this overall project, with nothing having been done like it in Roseville or other <br />32 <br />inner-ring suburbs, creating a challenge, even though her personally thought the single-family <br />33 <br />rambler market was strong enough, as well as previous rowhome successes, indicating a <br />34 <br />demand in the metropolitan area for such housing types. <br />35 <br />36 <br />At the request of Member Wall, Ms. Olson confirmed that the authors of the report were not <br />37 <br />present in tonight’s audience. <br />38 <br />39 <br />Member Elkins thanked GMHC for the comprehensive presentation included in the packets, <br />40 <br />which she found very enlightening. <br />41 <br />42 <br />At the request of Chair Maschka, Ms. Kelsey addressed proposed property ownership of <br />43 <br />Phases II and III at this point, with the northern half of that parcel left over, and only the <br />44 <br />demolition of the fire station included in Phase I. <br />45 <br />46 <br />Community Development Director Paul Bilotta <br />47 <br />Chair Maschka requested that staff provide their recommendations based on negotiations with <br />48 <br />GMHC to-date; and their estimation of the three options outlined in the staff report, as phased. <br />49 <br />50 <br />Mr. Bilotta advised that this is a tough decision, and in addition to ownership issues between <br />51 <br />the City and HRA, forethought was needed to determination the results if the project failed. <br />52 <br />53 <br />On the positive side, Mr. Bilotta noted that the buildings on Cope Avenue were relatively <br />54 <br />contained from an infrastructure perspective, other than some shared storm water amenities <br />55 <br />crossing lot lines. Mr. Bilotta advised that, of a bigger concern was, if Phases II and III were <br /> <br />