Laserfiche WebLink
Any segement included in a road CIP should be considered on its merits at that time. <br />All on road facility improvements should be considered at the next scheduled pavement rehabilitation project. <br />2 of 2 10/17/2013 <br />Pathway Master Buildout Plan- SORTED BY RANK <br />Map #Street <br />Name/ Segment Description <br />Between <br />Length <br />(Miles) <br />Estimated Cost <br />Subtotal in <br />-$1M <br />increments <br />Build Year Funding <br />Source <br />Rank(1-5) <br />DeBenedet <br />Vanderwall <br />Gjerdingen <br />Felice <br />Stenlund <br />32 <br />Eustis to St Croix Connection <br />Eustis to St Croix Connection <br />0.2 <br />$ <br />93,800.00 <br />$ 11,187,938.03 <br />3.90 <br />5 <br />4 <br />4.5 <br />3 <br />3 <br />2 <br />County Road C2 (W of Snelling) <br />Lincoln Dr to Wheeler (around the south side of <br />Oasis Pond <br />0.32 <br />$ <br />297,080.00 <br />3.92 <br />4.1 <br />5 <br />4.5 <br />5 <br />1 <br />1 <br />County Road D <br />Cleveland to Fairview <br />0.5 <br />$ <br />301,300.00 <br />4.06 <br />2.3 <br />5 <br />4 <br />5 <br />4 <br />15 <br />Lexington Avenue <br />County Road C2 to County Road D <br />0.5 <br />$ <br />304,750.00 <br />4.08 <br />4.4 <br />4 <br />3 <br />4 <br />5 <br />2 <br />County Road C2 W of Snelling) <br />Langton Lake Park to Cleveland <br />0.45 <br />$ <br />312,300.00 <br />$ 12,403,368.03 <br />4.16 <br />4.3 <br />3 <br />4.5 <br />5 <br />4 <br />Centre Pointe Drive to Long Lake Road <br />0.13 <br />$ <br />1,690,220.00 <br />$ 14,093,588.03 <br />4.20 <br />5 <br />5 <br />5 <br />5 <br />1 <br />8 <br />Roselawn Avenue <br />Fairview to Snelling <br />0.5 <br />$ <br />329,750.00 <br />4.20 <br />5 <br />4 <br />5 <br />4 <br />3 <br />Snelling to Hamline <br />0.5 <br />$ <br />329,750.00 <br />4.20 <br />5 <br />4 <br />5 <br />4 <br />3 <br />28 <br />Mackubin Street <br />Judith Ave to Iona Ln <br />0.1 <br />$ <br />63,250.00 <br />Parks <br />Renewal <br />4,30 <br />5 <br />3.5 <br />4 <br />4 <br />5 <br />2 <br />County Road C2 W of Snelling) <br />Long Lake Road to Long Lake Road <br />0.25 <br />$ <br />173,500.00 <br />4.36 <br />4.8 <br />4 <br />5 <br />5 <br />3 <br />Long Lake Road to Highway 88 <br />0.3 <br />$ <br />208,200.00 <br />4.36 <br />4.8 <br />4 <br />5 <br />5 <br />3 <br />Highway 88 to Highcrest <br />0.2 <br />$ <br />138,800.00 <br />$ 15,336,838.03 <br />4.36 <br />4.8 <br />4 <br />5 <br />5 <br />3 <br />8 <br />Roselawn Avenue <br />City Boundary to Cleveland <br />0.75 <br />$ <br />494,625.00 <br />4.40 <br />5 <br />5 <br />5 <br />4 <br />3 <br />Cleveland to Fairview <br />0.5 <br />$ <br />329,750.00 <br />4.40 <br />5 <br />5 <br />5 <br />4 <br />3 <br />15 <br />Lexin on Avenue <br />County Road C to County Road C2 <br />0.5 <br />$ <br />304,750.00 <br />$ 16,465,963.03 <br />4.60 <br />4.4 <br />4 <br />5 <br />5 <br />7 <br />County Road B (Option 2- On Road) <br />Highway 280 to Cleveland Avenue <br />1 <br />$ <br />339,600.00 <br />$ 16,805,563.03 <br />2015-2020 <br />4.64 <br />4.2 <br />5 <br />5 <br />4 <br />5 <br />7 <br />County Road B (Option 1- Off Road) <br />Highway 280 to Cleveland Avenue <br />1 <br />$ <br />579,500.00 <br />$ 17,045,463.03 <br />2015-2020 <br />4.84 <br />4.2 <br />5 <br />5 <br />5 <br />5 <br />Any segement included in a road CIP should be considered on its merits at that time. <br />All on road facility improvements should be considered at the next scheduled pavement rehabilitation project. <br />2 of 2 10/17/2013 <br />