Laserfiche WebLink
Mr. Thomas Paschke <br />Page 3 <br />April 27, 2015 <br />there wiil be any petroleum storage on-site for refueling construction equipment. If so, it should <br />be documented how this storage will be contained, and what the response would be in the <br />event of a release of petroleum products. <br />146. Air. <br />• There will be an increase in vehicular emissions, particularly from equipment during <br />construction of the hotels. The information requested in this section should be included here. <br />14C. Dust and odors. <br />• There will be a significant increase in dust during construction of this Project. The measures to <br />be used to minimize or mitigate the effects of dust both from the site and from soil transported <br />from the site to the streets from construction traffic should be discussed in this section. <br />15. Noise. <br />• Noise levels will increase with construction equipment use. The Project should conform to any <br />local noise ordinances. This should be addressed in this section. <br />16. Transportation. <br />• The traffic study was not included as part of the MPCA's review of the draft City Environmental <br />Review Worksheet. The traffic study should be summarized and included in these sections. <br />18. Cumulative potential effects. <br />• If contaminated soil is encountered at the site, excavating and hauling this hazardous material <br />has the potential to combine with fugitive dust emissions, and should be discussed in this <br />section. <br />The MPCA appreciates efforts the city of Roseville will be making in responding to our comments and <br />inputs in the City Environmental Review Worksheet document. We look forward to working with you <br />and offer assistance to insure all of our concerns are addressed. <br />We appreciate the opportunity to review this Project. Please be aware that this letter does not <br />constitute approval by the MPCA of any or all elements of the Project for the purpose of pending or <br />future permits action(s) by the MPCA. Ultimately, it is the responsibility of the Project proposer to <br />secure any required permits and to comply with any requisite permit conditions. If you have any <br />questions concerning our review of this draft document, please contact me at 651-757-2465. <br />Sincerely, <br />�/�� . � �z- <br />��•-�atrice Jen en <br />Planner Principal <br />Environmental Review Unit <br />Resource Management and Assistance Division <br />PJ:bt <br />