Laserfiche WebLink
Page 6 of 38 <br />Permit No: MNR040000 <br />PART II. APPLICATION REQUIREMENTS <br />A. Application for Reauthorization <br />If a permit has been issued by the Agency and the permittee holding the permit desires to <br />continue the permitted activity beyond the expiration date of the permit, the permittee shall <br />submit a written application for permit reissuance at least 180 days before the expiration date <br />of the existing permit. (Minn. R. 7001.0040, subp.3). <br />B. New Permittee Applicants <br />To become a new permittee authorized to discharge stormwater under this permit, the <br />owner/operator of a small MS4 shall submit an application, on a form provided by the <br />Commissioner, in accordance with the schedule in Appendix A, Table 3, and the following <br />requirements: <br />1. Submit Part 1 of the permit application (includes the permit application fee). <br />2. Submit Part 2 of the permit application, with the Stormwater Pollution Prevention Program <br />(SWPPP) document completed in accordance with Part II.D. <br />C. Existing Permittee Applicants <br />All existing permittees seeking to continue discharging stormwater associated with a small MS4 <br />after the effective date of this permit shall submit Part 2 of the permit application, on a form <br />provided by the Commissioner, in accordance with the schedule in Appendix A, Table 1, with the <br />SWPPP document completed in accordance with Part II.D. NOTE: Existing permittees were <br />required to submit Part 1 of the permit application prior to the expiration date (May 31, 2011) <br />of the Agency's small M54 general permit No.MNR040000, effective June 1, 2006, (see Part ILA <br />a bove). <br />D. Stormwater Pollution Prevention Program (SWPPP) Document <br />All applicants shall submit a SWPPP document with Part 2 of the application form when seeking <br />coverage under this permit. The SWPPP document shall become an enforceable part of this <br />permit upon approval by the Commissioner. Modifications to the SWPPP document that are <br />required or allowed by this permit (see Part III.G) shall also become enforceable provisions. The <br />SWPPP document shall be submitted on a form provided by the Commissioner and shall include <br />the following: <br />1. A description of partnerships with another regulated small MS4(s), into which the applicant <br />has entered, in order to satisfy one or more requirements of this permit. <br />2. A description of all Regulatory Mechanism(s) (e.g., contract language, an ordinance, permits, <br />standards, etc.) the applicant has developed, implemented, and enforced that satisfies the <br />requirements of each program specified under Part III.D.3, 4, and 5. The description shall <br />include the type(s) of Regulatory Mechanism(s) the applicant has in place at the time of <br />application that will be used to satisfy the requirements. If the Regulatory Mechanism(s) <br />have not been developed at the time of application (e.g., new permittee applicants), or <br />revised to meet new requirements of this permit (e.g., existing permittee applicants); the <br />