My WebLink
|
Help
|
About
|
Sign Out
Home
2015-05-26_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2015
>
2015-05-26_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2015 11:45:51 AM
Creation date
5/22/2015 8:23:39 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/26/2015
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 14 of 38 <br />Permit No: MNR040000 <br />b. Site plan review <br />The program shall include written procedures for site plan reviews conducted by the <br />permittee prior to the start of construction activity, to ensure compliance with <br />requirements of the Regulatory Mechanism(s). The site plan review procedure shall <br />include notification to owners and operators proposing construction activity of the <br />need to apply for and obtain coverage under the Agency's general permit to Discharge <br />Storm water Associated with Construction Activity No.MN RI00001. <br />C. Public input <br />The program shall include written procedures for receipt and consideration of reports of <br />noncompliance or other stormwater related information on construction activity <br />submitted by the public to the permittee. <br />d. Site inspections <br />The program shall include written procedures for conducting site inspections, to <br />determine compliance with the permittee's Regulatory Mechanism(s). The written <br />procedures shall: <br />(1) Include procedures for identifying priority sites for inspection. Prioritization can be <br />based on such parameters as topography, soil characteristics, type of receiving <br />water(s), stage of construction, compliance history, weather conditions, or other <br />local characteristics and issues. <br />(2) Identify frequency at which site inspections will be conducted <br />(3) Identify name(s) of individual(s) or position titles responsible for conducting site <br />inspections <br />(4) Include a checklist or other written means to document site inspections when <br />determining compliance. <br />e. ERPs required by Part 111.13 of this permit <br />f. Documentation of the following information: <br />(1) For each site plan review —The project name, location, total acreage to be <br />disturbed, owner and operator of the proposed construction activity, and any <br />stormwater related comments and supporting documentation used by the <br />permittee to determine project approval or denial. <br />(2) For each site inspection - Inspection checklists or other written means used to <br />document site inspections <br />
The URL can be used to link to this page
Your browser does not support the video tag.