My WebLink
|
Help
|
About
|
Sign Out
Home
2015_0615_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_0615_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2015 11:29:22 AM
Creation date
6/11/2015 11:51:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2015 Fee Schedule <br />Electrical Permit Fees - continued <br />O. For inspection of transient projects, including but not limited to, carnivals and <br />circuses, the inspection fees shall be computed as follows: <br />Power supply units according to Item "B" of fee schedule. A like fee <br />will be required on power supply units at each engagement during the <br />season, except that a fee of $35.00 per hour will be charged for <br />additional time spent by the Inspector if the power supply is not ready <br />for inspections as required by law. <br />Rides, Devises or Concessions: Shall be inspected at their first <br />appearance of the season and the inspection fee shall be $35.00 per unit. <br />P. The fee is doubled if the work starts before the permit is issued. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.