My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1480
Roseville
>
City Council
>
City Council Ordinances
>
1400
>
ord_1480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2018 10:52:22 AM
Creation date
6/29/2015 4:00:42 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
6/22/2015
Ordinance #
1480
City Code Chapter Amendment
C314
Ordinance Date Passed
6/22/2015
Ordinance Date Published
7/7/2015
Publication Type
Ordinance
Publication Newspaper
Review
Publication Date (lst)
7/7/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2015 Fee Schedule <br /> Building Permit and Plan Review Fees - continued <br /> Building Permit Fee—Engineering: <br /> 2014 2015 <br /> Total Valuation Amount Amount <br /> $1 - $500 $ 5 $ 5 <br /> $501 - $2,000 5 5 <br /> $2,001 - $25,000 25 25 <br /> $25,001 - $50,000 50 50 <br /> $50,001 - $100.000 75 75 <br /> $100,001 - $500,000 100 100 <br /> $500,0001 - $1,000,000 200 200 <br /> In excess of$1,000,000 300 300 <br /> Demolition Permit Fee: <br /> Description 2014 Amount 2015 Amount <br /> Tenant improvement/remodeling prior to building $71.00 $73.00 <br /> permit <br /> Structures not connected to utilities 92.00 94.00 <br /> Residential structures connected to city utilities 158.00 160.00 <br /> Commercial structures connected to city utilities $406.00 $415.00 <br /> Electrical Permit Fee: <br /> Set through yearly contract with Contract Electrical Inspector <br /> Fire Safety Inspection Fee: <br /> An amount equal to eight percent (8%) of the amount determined by the Building Permit Fee <br /> (except for single-family dwellings) to be charged and used to defray the cost of fire safety <br /> inspections (Ord. 1237, 3-13-2000, eff. 5-1-2000) <br /> Grading Plan Review Fee—Planning & Zoning: <br /> Description 2014 Amount 2015 Amount <br /> 50 cubic yards or less $77 $79 <br /> $153.00 for the first 1,000 $156.00 for the first 1,000 <br /> 51 — 10,000 cubic yards cubic yards, plus $10.00 for cubic yards, plus $10.00 for <br /> each additional 1,000 yards or each additional 1,000 yards or <br /> fraction thereof fraction thereof <br /> $306.00 for the first 10,000 $312.00 for the first 10,000 <br /> 10,001 — 100,000 cubic yards cubic yards, plus $5.00 for cubic yards, plus $5.00 for <br /> each additional 10,000 yards each additional 10,000 yards <br /> or fraction thereof or fraction thereof <br /> $816.00 for the first 100,000 $832.00 for the first 100,000 <br /> In excess of 100,000 cubic cubic yards, plus $10.00 for cubic yards, plus $10.00 for <br /> yards each additional 10,000 yards each additional 10,000 yards <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.