Laserfiche WebLink
City of Roseville 2015 Fee Schedule <br /> Building Permit and Plan Review Fees - continued <br /> Investigation Fee: Work without a Permit <br /> Whenever any work for which a permit is required from the city has been commenced without <br /> first obtaining said permit, a special investigation shall be made before a permit may be issued for <br /> such work. An investigation fee, in addition to the permit fee, shall be collected whether or not a <br /> permit is then or subsequently issued. The investigation fee shall be equal to the amount of the <br /> permit fee required by this code. The payment of such investigation fee shall not exempt any <br /> person from compliance with all other provisions of this code nor from any penalty prescribed by <br /> law. <br /> Manufactured Home Permit Fee: <br /> Description 2014 Amount 2015 Amount <br /> New installation $ 265.00 $ 270.00 <br /> Mechanical Permit Fee - Residential: <br /> Description 2014 Amount 2015 Amount <br /> Air conditioning-new $ 47.00 $ 48.00 <br /> Air conditioning-replacement 59.00 60.00 <br /> Warm air furnace-new 99.00 100.00 <br /> Warm air furnace - replacement 59.00 60.00 <br /> Hot water boilers-new 99.00 100.00 <br /> Hot water boilers-replacement 59.00 60.00 <br /> Unit heaters 59.00 60.00 <br /> Swimming pool heaters 59.00 60.00 <br /> Misc. work & gas piping 1.28% of job cost 1.28% of job cost <br /> Minimum fee 59.00 60.00 <br /> Gas fireplace 59.00 60.00 <br /> In floor heat 82.00 84.00 <br /> $1.28 % of job cost $1.28 % of job cost <br /> Solar panel installation / $153.00 min fee / $156.00 min fee <br /> Mechanical Permit Fee - Commercial: <br /> Description 2014 Amount 2015 Amount <br /> 1.28% of job cost/ 1.28% of job cost/ <br /> All commercial work $59.00 min fee $60.00 min fee <br /> House Moving Permit Fee: <br /> Description 2014 Amount 2015 Amount <br /> Over private property only $91.00 $93.00 <br /> Over public streets 133.00 135.00 <br /> Investigation fee per hour $66.00 $67.00 <br /> 10 <br />