Laserfiche WebLink
Attachment C <br />Twin Lakes Parkway: Phase III <br />July 30, 2015 Open House <br />Comment Forms Received <br />1. I think all of the options look great. As an employee of a business off Arthur <br />Street, I would love to have a safer way of getting onto east bound County C or <br />even just to get to Fairview. In the mornings and evenings it can be difficult to <br />make either a left or a right turn from the deep end Arthur St to County Road C. <br />Thank you for considering this street extension. <br />2. I am so pleased that the parkway is finally being built. As one of the original <br />planners, I have been waiting for the whole area to be developed! <br />3. It's about time to put the road through! ! Just do it! ! <br />4. **The temporary closure of Wheeler St. N** Since Wheeler St is still closed this <br />development would even more negatively impact traffic in the boxed in area for <br />all of the city of Roseville residents. All of the residents of Roseville should be <br />involved and vote on the street closure just like this Twin Lakes Parkway Phase! <br />(Double standards come into mind). With Wheeler St. N open as the street has <br />been forever, I would not be opposed to any Twin Lakes Parkway development <br />change! I live on Wheeler St at 3053 in the middle of the block. This has been <br />very disturbing the way you city engineers have been working for one side of an <br />issue that is such concerning to all residents of Roseville! ! Who should the rest of <br />us talk to?? <br />2660 Civic Center Drive �:• Roseville, Minnesota 55113 <br />651-792-ROSE ❖ TDD 651-792-7399 �:•www.cityofroseville.com <br />