My WebLink
|
Help
|
About
|
Sign Out
Home
2015_0810_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_0810_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2015 10:01:25 AM
Creation date
8/6/2015 9:57:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��� <br />� <br />REQUEST FOR COUNCIL ACTION <br />Department Approval <br />._ �� --- G �---- <br />Date: August 10, 2015 <br />Item No.: 8.d <br />City Manager Approval <br />Item Description: Approve Resolution Awarding Contract for the 2015 Drainage <br />Improvements Project— SW-15-09 <br />BACKGROUND <br />This year's drainage improvement project consists of four areas that have had problematic <br />drainage or are in need of repair. They are as follows; <br />PROJECT 1: STORM SEWER MODIFICATIONS ON COUNTY ROAD C-2 <br />This proj ect consists of the installation of new catch basins and stonn sewer pipe, replacing castings <br />on existing structures, and associated curb and gutter and pavement replacement. <br />This area in the past has had severe street flooding due to poor inlet capacity resulting in flooding of <br />the adjacent property. The new improvements should minimize the risk of flooding. <br />PROJECT 2: STORM SEWER MODIFICATIONS AT Z993 FARRINGTON �SOUTH OWASSO BOULEVARD� <br />This project consists of the installation of new structures and storm sewer pipe, adjusting existing <br />structures, minor grading and turf restoration. <br />This area in the past did not have an adequate storm outlet, resulting in storm water that collected in <br />the bacic yard areas. Property damage from flooding has occurred during large storm events. The <br />creation of a new outlet should minimize future rislcs associated with flooding. <br />PROJECT 3: DRAINAGE IMPROVEMENTS AT 2195 MARION STREET <br />This project consists of the installation of storm sewer pipe and drain tile, storm sewer structures, <br />minor grading, and associated restoration. <br />This area in the past did not have an adequate storm outlet, resulting in storm water that collected in <br />the back yard areas. Structural damage due to flooding has occurred during large storm events. The <br />creation of a new outlet should minimize future risks associated with flooding. <br />PROJECT 4: BENNETT LAKE INTAKE SYSTEM IMPROVEMENTS <br />This project consists of removal and replacement of the Bennett Lake intake system structure, <br />installation of a 24" gate valve, and necessary appurtenances and restaration. <br />This project is a maintenance project to rebuild the intake that was in need of repair. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.