My WebLink
|
Help
|
About
|
Sign Out
Home
2015-07-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2015
>
2015-07-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2015 10:35:10 AM
Creation date
8/6/2015 10:33:01 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/28/2015
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sundial Solar references <br />Municipal & Nonprofit projects <br />Minnesota's First Micro -grid <br />Steger Wilderness Center, Ely, MN <br />Contact Will Steger <br />steaer gmail.com <br />For over 20 years famous Polar Explorer Will Steger and his foundation have been <br />constructing a leadership center in the North Woods outside Ely, MN. Up until <br />recently the only power they had came from diesel generators, which make a huge <br />racket when they rnn. This system combines power from solar, wind, and propane <br />gen-sets to meet the needs of the campus. It is the first such system in the state <br />Cherokee Park United Church <br />St Paul, MN <br />Contact TomMmphy <br />trnmurnhvmn(olemaitcom <br />Minnesota's First Municipal Solar Array <br />Royalton City Hall, Royalton, MN <br />Contact: Mayor Andrea Lauer <br />mavor(o)rovaltommn.com <br />It was not so long ago that solar energy was in the Dark Ages in Minnesota. It <br />took the guts and determination of a few solar pioneers to make the leap of <br />faith required to install solar on their property. One of those pioneers was the <br />City of Royalton, a small municipality northwest of the Twin Cities. Mayor <br />Andrea Lauer educated herself and her constituents and took the plunge <br />Sundial crafted a unique financial model that allowed the City to reduce its <br />bottom line costs with a capital lease and PPA. <br />With all the solar activity going on in the Twin Cities lately, members of <br />the Cherokee Park United Church began asking their pastor if there was <br />any possibility of installing solar on their building. Not one to waste time, <br />Pastor Tim Johnson and his staff dug in to learn what options were <br />available What they discovered was the unique financing options and the <br />variety of equipment offered by Sundial. This array stands as one of the <br />largest on a church in Minnesota. <br />Edison High School <br />Northeast Minneapolis, MN <br />Contact: Michael Krause <br />michaelkrause6l(wahoo.com <br />With such huge growth in the solar industry it is only <br />natinal that some of the educational potential should filter <br />down into the school system. Sundial is the leader in <br />school deployment which is highlighted with this most <br />ambitious project By school year 2015 Edison H.S. will <br />nearly 500kw of panels made up of several different solar <br />technologies on roofs and canopies. Each will be <br />connected to a central monitoring station and utilized in <br />educational curriculum. <br />
The URL can be used to link to this page
Your browser does not support the video tag.