My WebLink
|
Help
|
About
|
Sign Out
Home
2015_0713_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_0713_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2015 4:09:41 PM
Creation date
8/7/2015 11:35:31 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT MEMORANDUM <br />T0: <br />FROM: <br />DATE: <br />SUBJECT <br />'� �.i r s c � '� _`; ?_ � f.� <br />Pat Trudgeon, City Manager <br />Paul Bilotta, Community Development Director <br />Mikaela Huot, ConsultantlVice President <br />July 8, 2015 <br />Financing Summary for TIF 17 (Twin Lakes) <br />Attachment B <br />Springsted Incorporatetl <br />380 Jackson Street, Suite 300 <br />Saint Paul, MN 55101-2887 <br />Tel: 651-223-3000 <br />Fax: 651-223-3002 <br />www.springsted.com <br />The City of Roseville established Tax Increment Financing (Redevelopment) District No. 17 in 2005 for the <br />redevelopment of certain properties. TIF District No. 17 was certified in 2005 and the first increment revenue was <br />received in 2006. The final date that the district can collect increment revenue is 2031 with a maximum term of <br />collection of 25 years after receipt of first increment. Because of the certification date, the TIF District is subject to the <br />5 year rule (which limits future financing activities). Due to the economic recession, the five year rule was modified in <br />2009 to allow certain districts an additional 5 years, with TIF District No. 17 had a total of 10 years in which qualifying <br />activities could occur. The five year period (extended to 10 years for this district) is up on September 3, 2015. <br />Tax Increment Analvsis <br />Springsted prepared tax increment revenue projections based on information provided by Ramsey County and the <br />City of Roseville. Assumptions used to prepare the revenues include the following: <br />• Maximum TIF District term <br />o Total 25+ years (through 2031) <br />0 17 years remaining (2015-2031) <br />• Payable 2015 values as provided by County <br />o Base net tax capacity of $496,071 <br />o Current net tax capacity of $663,672 <br />o Captured net tax capacity of $167,601 <br />o Estimated tax increment of $171,084 <br />• Commencing payable 2017 <br />o Additional increment available from two new hotels <br />■ Building permit value of $7 million each <br />■ Total estimated new value of $14 million <br />• 75% of estimated value assumed for revenue projections <br />Public S�ctor Advisors <br />
The URL can be used to link to this page
Your browser does not support the video tag.