My WebLink
|
Help
|
About
|
Sign Out
Home
2001 Approved Budget
Roseville
>
Budget
>
2001 Approved Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2015 1:40:36 PM
Creation date
8/12/2015 1:40:11 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cityof Roseville,Minnesota2001 Budget <br />ATHWAY <br />Fund: Pathway Maintenance <br />Account Number: 408-064.000 <br />Organizational Accountability: Public Works Director <br />D <br />EPARTMENTALDESCRIPTION <br />2001 <br />During the past 20 years, the City has installed miles of <br />PLAN <br />pathways through its parks and an additional 35.5 miles as part <br />of the street system. The City Council has implemented a new <br />program of methodical and intentional maintenance. Implement a maintenance program <br />of the City’s existing pathways <br />which will provide for an annual <br />maintenance of five miles <br />IT <br />NPUS <br />1999 <br />A <br />CHIEVEMENTS <br />New program begun in 2000 <br /> Full-Time Equivalent Positions <br />C <br />EO <br />ITY <br />XPECTEDUTCOMES <br /> Miles of PathwavI45.5 I45.5 I45.51 <br />Miles Maintained <br />I <br />I <br /> Cost per Mile of Maintenance23,377$20,000 I <br />Strategic Outcomes: <br />Citizen Benefit/Impact: <br /> Encouragement of physical healthAn opportunity for citizens to improve <br />by providing paths for walking,their health <br />running, rollerblading, and biking <br /> Safe network of paths <br />IV-49 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.