My WebLink
|
Help
|
About
|
Sign Out
Home
2001 Approved Budget
Roseville
>
Budget
>
2001 Approved Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2015 1:40:36 PM
Creation date
8/12/2015 1:40:11 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
either by transfers from the contingency section of the general fund budget or by revenues <br />received in excess of the budgeted amounts.All budget amounts lapse at the end of the year to <br />the extent they have not been expended.The level which expenditures may not legally exceed <br />appropriations is at the fund level. <br />Long Range Planning (Capital Improvement Program (CIP)) Overview <br />As part of the annual budget and the long range planning process, the city also updates a 5-year <br />Capital Improvement Program <br />The Capital Improvement Process is on going throughout the year, as the city council studies and <br />approves various projects. The document preparation is an affirmation of those approvals as well <br />as a projection of potential projects that may be approved within the 5-year period. <br />The general guideline for inclusion would be equipment of a capital nature, and construction <br />project cost generally in excess of $500.Items may appear in the that are under the <br />minimum amount, but they are evaluated on the basis of the substance of the expenditure. <br />I-15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.