My WebLink
|
Help
|
About
|
Sign Out
Home
2001 CAFR
Roseville
>
Budget
>
2001 CAFR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2015 11:41:11 AM
Creation date
8/12/2015 1:43:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The appropriated budget is prepazed by fund, function (e.g., public sa%ty), and department (e.g., <br />police). Department heads may make transfers of appropriations within a department. Transfers <br />of appropriations between funds, however, require the special approval of the city council. <br />Budget-to-actual comparisons aze provided in this report for each individual governmental fund <br />for which an appropriated annual budget has been adopted. For the general fund, this <br />comparison is presented on page 27 as part of the basic financial statements for the govemmental <br />funds. For governmental funds, other than the general fund, with appropriated annual budgets, <br />this comparison is presented in the governmental fund subsection of this report, which starts on <br />page 28. <br />Factors Affecting Financial Condition <br />The information presented in the financial statements is perhaps best understood when it is <br />considered from the broader perspective of the specific environment within which the City of <br />Roseville operates. <br />Local economy. The City of Roseville currently enjoys a favorable economic environment and <br />local indicators point to continued stability. The region while noted for a strong retail sector, <br />enjoyed considerable re-development in recent years. The re-deve�opment consisted of vazied <br />manufacturing, medical and high-tech base that adds to the relative stability of the <br />unemployment rate. Major industries with headquarters or divisions located within the <br />government's boundaries or in close proximity include computer hardware and software <br />manufacturers, electrical controls and medical services, and several divisions of state <br />government departments which administer the state highway system and the states' educational <br />administration of K-12 operations. <br />The City of Roseville area has an employed labor force of approximately 40,000 which is <br />anticipated to grow at a rate of 3 percent each year for the next several years. <br />Because of the fully developed nature of the community, the opportunity for new and expanded <br />housing is limited. The city's emphasis has been, in recent yeazs, on assisting homeowners to <br />redevelop and remodel the current available housing so that as the change-over from older <br />residents occurs, younger families will continue to be attracted to Roseville. <br />Long-term fmancial planning. The city council is in the planning stages of improving both <br />govemmental service facilities for public safety and general governmental use, and a community <br />center with facilities needed for attracting and retaining a strong resident population. <br />It is anticipated that a bond referendum to fmance the improved community facilities, will be <br />presented to the community in 2002. <br />The city is also working closely with state, federal and neighboring communities to improve the <br />area's state and county transportation network, which includes commuter rail, upgraded <br />highways and well-placed pathways. Funding for most of the transportation improvements will <br />need to come from state, county and federal sources, with some minor portion supported by the <br />local taxpayers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.