My WebLink
|
Help
|
About
|
Sign Out
Home
2015_0112_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_0112_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 12:12:26 PM
Creation date
8/14/2015 3:43:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCLUSIONS & RECOMMENDATIONS <br />A. All portions of the project proposed are feasible. <br />B. Estimated project cost: <br />Project Cost <br />Street Reconstruction $1,290,805.20 <br />Sidewalk Construction Segment A $170,440.00 <br />(Larpenteur Ave to County Road B) <br />Sidewalk Construction Segment B $120,000.00 <br />(County Road B to County Road B2) <br />Storm Sewer Construction $215,000.00 <br />Utility Maintenance $37,000.00 <br />Total $1,833,245.20 <br />The following is a summary of the recommendations discussed in this report. <br />A. Construct the project in 2015 <br />Construct a 6 ft wide concrete sidewalk along the east side of Victoria Street north of Roselawn <br />Ave, extended north to County Road 62 (roadway reconstruction stops at County Road B) <br />C. Construct an 8 ft wide bituminous path along the east side of Victoria Street south of Roselawn <br />Ave (subject to change to a 6 ft sidewalk based on final engineering). <br />D. South of Roselawn Ave: <br />Construct a 32 ft wide, bituminous street with a rural design (no curb and gutter) <br />11 foot lanes <br />Prohibit parking on one side of the roadway (proposed west side of roadway) <br />Provide a 2 ft shoulder on the west side of Victoria Street <br />Provide an 8 ft shoulder on the east side of Victoria Street for parking. <br />E. North of Roselawn Ave: <br />Construct a 32 ft wide, bituminous street with B-618 concrete curb and gutter. <br />Provide an 8 ft shoulder on the east side of Victoria Street for parking. <br />F. Repair sanitary sewer and watermain infrastructure along the corridor as needed. <br />G. Construct storm sewer improvements to address water quality, meet watershed requirements <br />for new impervious surfaces, and address drainage concerns along the corridor. <br />H. Fund the reconstruction project with Municipal State Aid funds, utility funds, assessments and <br />Park Renewal Bond funds as detailed this report. <br />I. Schedule a public hearing for the Victoria Street project on Monday, February 23, 2015. <br />Project P-ST-SW-15-02 <br />Victoria Street Reconstruction <br />12 <br />Feasibility Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.