Laserfiche WebLink
33 Public Works Director Culver reviewed project updates and maintenance activities <br />34 listed in the staff report and attachments dated July 28, 2015. Due to limited time <br />35 for the business portion of tonight's meeting, Mr. Culver asked individual members <br />36 of the PWETC to contact staff for any additional information or if they had <br />37 questions. <br />38 <br />39 5. City Campus Solar Panel Installation Proposal Review and Recommendation <br />40 Public Works Director Culver provided a quick overview of two proposals received <br />41 for a solar panel installation on the Oval/Skating Center roofs, as detailed in the <br />42 staff report dated July 28, 2015; and as displayed v' ower Point presentation, a <br />43 copy of which is made a part of the staff report tacked hereto and made a <br />44 part hereof. <br />45 mull <br />46 Mr. Culver noted ro receipt of two proposals: onllllle from TruNorth with several options <br />P P P <br />47 included in their response to the Request for Proposals (RFP) and a proposal from <br />48 Sundial Solar. Based on ownership and upfront costs, and after staffs analysis and <br />49 comparison of the two proposals and full submittals from both solar developers, <br />50 Mr. Culver advised staff was recom ding en ing into an agreement with <br />51 Sundial Solar for a Pow'urchase Ag ment system that the City will then be <br />52 able to purchase in the 'sixth year after installation with the use of a charitable <br />53 contribution for a private sector third party. Mr. Culver noted the submittal from <br />54 Sundial was much more detailed and contained several tables providing for a cost <br />55 analysis and power production analysis. <br />56R� <br />57 Mr. Culver noted that the TruNorth proposal d the option for one power <br />58 purchase agreement and another option for a sim e direct purchase, with both <br />59 requiring entering into an energy partnership loan through the St. Paul Port <br />60 Authority (SPPA) for fifteen years, and based on minimum dollar amounts and <br />61 assumpti s detailed in the staff report. <br />62 <br />63 analyzing t e Sundial prUts <br />l, Mr. Culver noted the different power purchase <br />64 ement, with installation higher, but no upfront financing required of the <br />65 Ci r that initial purchase price, and therefore requiring no loan with the SPPA. <br />66 Mr. ulver noted this was due to taking advantage of tax equity financing and the <br />67 power purchase agreement, combined with the charitable contribution at year six <br />68 for the third party, at which time the City would purchase the system at 5% of the <br />69 fair market Nlue of the system and the tax equity partner would donate the <br />70 remainder for a large tax write -off. Mr. Culver reviewed advantages of this option <br />71 in overall power savings over a twenty year period, estimating an additional <br />72 $500,000 would be realized by the City in power savings alone. <br />73 <br />74 Mr. Culver advised that, as part of their proposal process, Sundial had toured the <br />75 roof area and realized it could make much more use of the roof space. <br />76 <br />77 In both scenarios, even with a smaller footprint, Mr. Culver advised that there were <br />78 further advantages with a solar panel system over the arena roof, as additional <br />Page 2 of 5 <br />