My WebLink
|
Help
|
About
|
Sign Out
Home
2015-08-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2015
>
2015-08-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 9:40:07 AM
Creation date
8/20/2015 9:39:29 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/25/2015
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: August 25, 2015 <br />Item Description: Communication Items <br />Item No: 4 <br />Projects update: <br />• Victoria Street Reconstruction and Sidewalk Project <br />• Retaining walls have all been installed. <br />• Existing bituminous surface was milled and the first lift of bituminous was <br />paved on August 14. <br />• Scheduled to construct sidewalk and bituminous pathway starting August <br />20. <br />• Work has begun on sidewalk work north of County Rd B. <br />• Ramsey County will now be doing a mill and overlay north of <br />County B next year to accommodate sidewalk work. <br />• Project still scheduled to be completed by October. <br />Pavement Maintenance Program <br />• New water main on the West Snelling service drive north of Roselawn <br />Ave. will begin on August 20. <br />• Scheduled to mill and overlay Wheeler St., Herschel St., Aldine St. and <br />Charlotte St. starting the week of August 24. <br />• Contractor will begin storm sewer work on Chatsworth St and Millwood <br />Ave. starting the week of August 24. <br />• Contractor has begun preparing for temporary water on Draper Ave. and <br />Shryer Ave. The water main on this street is planned to be replaced <br />starting September 8. <br />• Work on Roselawn Avenue will take place starting September 14. <br />• Lift Station Replacements <br />• The Wagner lift station work is scheduled to begin August 25. Work is <br />expected to take two weeks. <br />• Twin Lakes Parkway <br />• Council approved plans and specifications and authorized bidding at the <br />August 10 meeting. The plan is to open bids in September. <br />• 35W & Cleveland Interchange <br />• Opened bids on August 4a'. Six bids were received with the low bid <br />$1,598,448 from Forest Lake Contracting which was 13.3% under <br />estimate. This item is on the City Council agenda on August 24 to <br />consider awarding the bid. <br />• Water Meter Replacement Project: <br />• Ferguson is continuing to replace meters in the northeast section of the <br />City (Area 2). They have completed 1,995 out of 2,487 in this section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.