Laserfiche WebLink
9/28/2015 <br />SRF Consulting Group, Inc. Work Tasks and Person-Hour Estimates �� �� � <br />Client: CITY OF ROSEVILLE <br />Project: TERRACE LANE AT LINCOLN LANE REALIGNMENT, LINCOLN LANE TO <br />SNELLING AVE REALIGNMENT; SIGNAL MODIFICATION AT SNELLING Consulting Group, Inc. <br />AVENUE <br />TASK N0. TASK DESCRIPTION <br />5.1 Wetlands <br />- Prepare a Level 1 Wetland Delineation to verify potential wetlands. Tasks <br />include: <br />- Gather data from the National Wetland Inventory (NWI), Natural Resources <br />Conservation Service (NRCS) soil mapping, recent aerial photography, and <br />contour data. <br />Complete on-site field verification/review of wetland boundaries identified from <br />NWI or other sources. <br />Collect data for one wetland plot and one upland plot, including vegeTation, soils, <br />and hydrologic indicators for wetlands within project area. Does not include field <br />delineation (Level 2) of wetland boundaries. <br />Prepare technical memorandum to City documenting Level 1 wetland <br />delineation results. <br />Submittal of a WCA "no-loss" determination for LGU review and approval. <br />Assumes LGU would approve "no-loss" determination request. Assumes LGU <br />would notify Technical Evaluation Panel (TEP) of no-loss decision. Coordination <br />with USACE regarding no wetland impacts finding. Assumes USACE concurrence <br />by email correspondence. <br />5.2 Coordinate special design features required for the NPDES permit with the <br />roadway design group. Submit permit application on-line as an agent of the City. <br />Prepare SWPPP in compliance with requirements of NPDES Phase III. <br />5.3 Rice Creek Watershed District. Includes on-going coordination with the RCWD <br />and preparation of permit submittal package and required application materials. <br />See preliminary design task for coordination meeting. Assumes no attendance <br />the Board meeting. <br />5.4 MnDOT right of way access permit <br />SRF Deliverables: <br />- Wetland technical memorandum <br />Approved WCA "no loss" determination <br />SUBTOTAL-TASK 5 <br />6.0 CONSTRUCTION STAKING <br />66 daysX 3 hours per day =198 hours for survey crey plus 16hours for office to <br />prepare s[aking notes. <br />- Establish control points <br />- Construction limits <br />- Right of way and easements <br />Page 8 of 13 <br />P14 XXXX <br />PRINCIPAL SR. ASSOC. ASSOCIATE SR. PROF PROF. TECHNICAL CLERICAL TOTALS EST. FEE <br />0 2 0 14 0 0 0 16 $1,546 <br />0 <br />2 <br />0 <br />2 <br />0 <br />1 <br />16 <br />0 <br />19 <br />16 <br />8 <br />12 <br />0 <br />20 <br />0 <br />0 <br />0 <br />0 <br />14 <br />0 <br />0 <br />10 <br />1 <br />11 <br />200 <br />1 <br />4 <br />0 <br />5 <br />200 <br />0 <br />2 <br />0 <br />2 <br />0 <br />10 $1,227 <br />46 $5,636 <br />1 $86 <br />73 $8,495 <br />416 $47,488 <br />LWCOLN-SNELLING 2-Hrly_Tasks.xlsx <br />SRF CONSULTING GROUP, INC. ENGINEERS AND PI.ANNERS MINNEAPOLIS. MN <br />