My WebLink
|
Help
|
About
|
Sign Out
Home
2015-10-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2015
>
2015-10-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 11:18:53 AM
Creation date
10/27/2015 11:15:47 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/27/2015
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Met Council will be rehabbing two interceptors in Roseville in the Fall of 2016 <br />• 1' location on Avon St near County Rd D. <br />• 2°d location near County Rd B and Dale St. Some work would be in Upper <br />Villa Park <br />• Capital Region —Upper Villa Reuse and Infiltration Project <br />• Installation of an underground system on Upper Villa park behind the B -Dale <br />Club. <br />• Work to begin week of October 19. Substantial completion December 2015. <br />• Final restoration work will take place in the spring of 2016. <br />• Water Meter Replacement Project: <br />Ferguson is done with about 2,400 meters in Section 2 and about 1,400 in Section <br />3. <br />• Their deadline is 12/31/15 and are committed to completing this project on <br />time. <br />• City Staff only have the 24 left to do in Section 1. <br />Major Maintenance Activities: <br />• Continuing with miscellaneous street and pathway patching. <br />• Finished catch basin profiling. <br />• Sign maintenance. <br />• Hauled watermain soil stock piles for offsite disposal. <br />• Performed storm inspections for 2016 PMP. <br />• Preparing for salt delivery. <br />• Preparing for leaf pickup. Approximately 435 signed up. Pickup begins October 28. <br />• The 2015 sewer cleaning program is continuing. <br />• Read water meters in Area 1. <br />• Calibrated water meters with St. Paul Water. <br />• Collected 40 bacteriological samples for testing and 4 THM/HAAS quarterly samples. <br />• Repaired a broken water main at 2440 N. Rosewood. <br />• Worked with an electrical contractor to repair and convert all pole lights in the campus <br />and along Civic Center Drive to LEDs <br />Staff presented public work information to approximately 15 residents at Roseville U. Discussed <br />pavement management, pavement maintenance and sanitary sewers. <br />Attachments: <br />Attachment A - Meter Replacement Map <br />Attachment B — 2015 Project Map <br />Attachment C — 2015 Utilities Map <br />Attachment D — 2016 Met Council Project Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.