Laserfiche WebLink
Attachment E <br />c. Park and ride lot, and customer shelter. <br />Eghibit C Site Development Plan that includes property boundary, building setbacks, <br />structure location (including the trash enclosure), curbing, parking, parking <br />setbacks, and proof of parlcing (Drawing No. C-2), dated May 26, 2005. <br />Exhibit D Grading and Ponding/Storage Plan illustrating existing grades and those <br />proposed after completion of the proposed construction, drainage <br />directions, spot elevations, catch basins for surface water catchment, ponds <br />and storage basis (at and below surface) and the erosion control plan <br />(Drawing No. C-3), dated May 26, 2005. <br />Exhibit E Utility Servicing Plan including sanitary sewer, water mains and hydrants, <br />and storm sewer and illustrating all connections, pipe sizes, line locations, <br />manhole locations, hydrant locations, and other applicable utility plan <br />information (Drawing No. C-4), dated May 26, 2005. <br />Eghibit F Landscape Plan including materials list, sizes, and locations of all plant <br />materials (Drawing No. C-5), dated May 26, 2005. <br />E�hibit G Building floor plans with dimensions of the facility (Drawings No. A-1 & <br />A-2, dated May 26, 2005. <br />Eghibit H Building elevations with dimensions and materials identified (Drawings <br />No. A-3 & A-4), dated May 26, 2005. <br />Exhibit I Anticipated site development schedule with estimated date of construction <br />start, construction completion, utility, curb, gutter and landscape <br />installation, and tentative occupancy date, dated June 2, 2005. <br />Eghibit J Public Improvements Contract approved by the City stipulating all <br />requirements, terms, easements, and conditions with respect to public <br />improvements including (but not limited to) any utility, roadway, pathway, <br />storm water ponding, and boulevard restoration, dated June 20, 2005. <br />Exhibit K Snow Storage and Management Plan shall include staging locations for <br />temporary snow storage and the manner in which snow is transferred to <br />the melting machine. No temporary accessory fuel storage tank for the <br />operation of the snow melting machine shall be permitted on premises, <br />dated June, 2005. <br />