My WebLink
|
Help
|
About
|
Sign Out
Home
2015_1116_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_1116_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2015 3:07:16 PM
Creation date
11/12/2015 4:19:40 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment E <br />9.10 Site Construction & Security Fencing. The DEVELOPER is responsible for installing <br />construction or security fencing and for its removal prior to occupancy. The exact <br />location of the security fence and entrances must be approved by the Building Official <br />and Fire Marshall, or designees, prior to the issuance of building or excavation permits. <br />9.11 Site Landscapin�. Landscaping for the project shall include boulevard trees along <br />County Road B-2 and Snelling Avenue within Lots 3 and 4, Blocic 1, Rosedale Center `i <br />Fourth Addition, consistent with the Roseville Master Street Tree Plan and trees, shrubs <br />and perennials throughout the site that enhance the development and break up the <br />building wall mass. Where possible, the landscape plan shall include landscaped islands <br />within the parlcing lot to a minimum of 5% of the paved area within (Lot 3 and 4), as well <br />as screening (plants and/or berm) of the parking lot from public rights-of-way to a height <br />of 30 inches above the parlcing lot curb height. The site landscaping (Lot 3 and 4) must <br />be irrigated. The final landscape plan (Exhibit F) must be prepared by a state registered <br />landscape architect per Section 1010 of the City Code. K <br />9.12 Lanclscape Letter of Credit. Prior to the issuance of a grading, excavation, foundation, <br />and/or building permit, the DEVELOPER shall pxovide the CITY with a landscape letter <br />of credit, bond, or other security covering a minimum of one full growing season/calendar <br />year which is acceptable to the City in an amount up to 150% (as determined by the <br />Community Development Director or designee) of the full cost of all landscaping, <br />irrigation, and site restoration (Section 1010.14E) as per Exhibit F. After one (1) <br />complete growing season, DEVELOPER may request a partial release of the letter of <br />credit or bond. The amount to be released shall be agreed upon between the <br />DEVELOPER and the CITY acting reasonably. The CITY shall, if requested by the <br />DEVELOPER, return the full or remaining letter-of credit or bond to the DEVELOPER <br />after the landscape portion of the project has been closed out by the CITY. <br />9.13 T'rash Handling. Section lO10.11D requires all trash handling equipment (trash and <br />recycling dumpsters and/or compactors) to be contained within and under the principal <br />structure. The submitted plan indicates that the underground service area will include the <br />trash dumpster and compactor. <br />9.14 Service/Delivery Area. The CITY acknowledges that DEVELOPER has consulted with <br />the City's Chief of Police regarding security arrangements. The service/delivery area <br />proposed on the lower level of the addition shall have such security cameras as <br />recommended by the DEVELOPER's security consultant and as approved by the CITY's <br />Chief of Police or designee. <br />9.15 Of%Street Parking. Off-street parking areas within the subject property shall be <br />improved as shown on the approved site development plan (Exhibit C), and shall include <br />haxd surfacing (bituminous), concrete perimeter curbing, and a drainage plan. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.