Laserfiche WebLink
City of Roseville 2016 Fee Schedule <br />Building Permit and Plan Review Fees - continued <br />Gradin� Plan Review Fee - Engineerin�: <br />Descxiption 2015 Arzio�nt 2016 Arnount <br />50 cubic yards or less $ 25.00 $ 25.00 <br />51 - 10,000 cubic yards 25.00 25.00 <br />10,001 - 100,000 cubic yards 50.00 50.00 <br />In excess of 100,000 cubic <br />yards 75.00 75.00 <br />Gradin� Permit Fee - Planning & Zonin� <br />D�sGription 2Q15 Amount 20�6Amo�nt <br />50 cubic yards or less $79 $80 <br />$104.00 for the first 100 $106.00 for the first 100 <br />1- 1,000 cubic yards cubic yards, plus $20.00 for cubic yards, plus $20.00 for <br />each additional 100 yards or each additional 100 yards or <br />fraction thereof fraction thereof <br />1,001 - 10,000 cubic yards $312.00 for the first 1,000 $318.00 for the first 1,000 <br />cubic yards, plus $31.00 for cubic yards, plus $32.00 for <br />each additional 1,000 yards each additional 1,000 yards <br />or fraction thereof or fraction thereof <br />$624.00 for the first 10,000 $636.00 for the first 10,000 <br />10,001- 100,000 cubic yards cubic yards, plus $102.00 for- cubic yards, plus $104:00-for-- <br />each additional 10,000 yards each additional 10,000 yards <br />or fraction thereof or fraction thereof <br />In excess of 100,000 cubic $1,560.00 for the first $1,590.00 for the first <br />yards 100,000 cubic yards, plus 100,000 cubic yards, plus <br />$82.00 for each additional $84.00 for each additional <br />10,000 yards or fraction 10,000 yards or fraction <br />thereof thereof <br />Gradin� Permit Fee - En ing eering_ <br />Desexiptzo� 201� Amou�t 24J 6 A�aou�t <br />50 cubic yards or less $ 25.00 $ 25.00 <br />1- 1,000 cubic yards 25.00 25.00 <br />1,001 - 10,000 cubic yards 50.00 50.00 <br />10,001- 100,000 cubic yards 75.00 75.00 <br />In excess of 100,000 cubic <br />yards 100.00 100.00 <br />