My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1484
Roseville
>
City Council
>
City Council Ordinances
>
1400
>
ord_1484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2015 1:37:15 PM
Creation date
11/13/2015 1:12:02 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
11/9/2015
Ordinance #
1484
Ordinance Title
An Ordinance Amending Chapter 314.05, Fee Schedule Adopting the 2016 Fee Schedule
City Code Chapter Amendment
C3
Ordinance Date Passed
11/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
View images
View plain text
City of Roseville 2016 Fee Schedule <br />Electrical Permit Fees <br />A. Minimum fee for each separate inspection of an installation, replacement, <br />alteration or repair is limited to one inspection only: <br />2015 Amount 2016 Arilount <br />$ 35.00 $ 40.00 <br />B. Services, changes of service, temporary services, additions, alterations or repairs <br />on either primary or secondary services shall be computed separately: <br />Description 2015 Arnount 2016 Amount <br />0 to 300 arnp $50.00 $ 50.00 <br />301 to 400 amp 58.00 58.00 <br />401 to 500 amp 72.00 72.00 <br />501 to 600 amp 86.00 86.00 <br />601 to 800 amp 114.00 114.00 <br />801 to 1,000 amp 142.00 142.00 <br />1,001 to 1,100 amp 156.00 156.00 <br />1,101 to 1,200 amp 170.00 170.00 <br />Add $14 for each add' 1 100 amps <br />C. Circuits, installation of additions, alterations, or repairs of each circuit or sub- <br />feeder shall be computed separately, including circuits fed from sub-feeders and <br />including the equipment served, except as provided for in (D) through (K): <br />Description ' �015 Amount 241 "6 Amount <br />Oto30amp $8.00 $8.00 <br />31 to 100 amp 10.00 10.00 <br />101 to 200 amp 15.00 15.00 <br />201 to 300 amp 20.00 20.00 <br />301 to 400 amp 25.00 25.00 <br />401 to 500 amp 30.00 30.00 <br />501 to 600 amp 35.00 35.00 <br />601 to 700 amp 40.00 40.00 <br />Add $5 for each add'1 100 amps <br />Descriptidn 2015'Amount 2,�16 Amount <br />Residential panel replacement N/A $ 100.00 <br />Residential sub panel N/A 40.00 <br />N/A $40.00 plus $1 State <br />Minimum fee: Inspection only Surcharge <br />Minimum fee: Rough-in & Final N/A $80.00 plus $1 State <br />Surcharge <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).