My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2015_1019
Roseville
>
City Council
>
City Council Meeting Minutes
>
201x
>
2015
>
CC_Minutes_2015_1019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2015 1:37:01 PM
Creation date
11/13/2015 4:04:19 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
10/19/2015
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regular City Council Meeting <br />Monday, October 19, 2015 <br />Page 3 <br />were in tonight's audience to respond to questions or provide additional infor- <br />mation at the City Council's discretion. Mr. Miller sought feedback on any lin- <br />gering questions or umnet infonnation needs they desired from staff before final- <br />izing budget infonnation for presentation at the Noveinber 30, 2015 public hear- <br />ing. <br />At the request of Mayor Roe, Mr. Miller expounded on each of the six items rec- <br />ommended by staff: 3 new iteins and 3 transfers as noted. <br />Cit�Campus Geothermal S, s� <br />In staff s recommendation to defer this item from 2016 to 2017, Mr. Miller stated <br />that this item was not as time-sensitive as other items; and would involve the po- <br />tential hiring of a consultant. <br />City Manager Patrick Trudgeon concurred, advising that the consultant would be <br />taslced with reviewing existing geothermal systems already in place to determine <br />if there were any additional energy savings to be had as well as determining if the <br />systein was operating as originally intended. <br />At the request of Councilmeinber McGehee, City Manager Tnidgeon advised that <br />solar energy could be part of that analysis to determine if it could be inter-linlced; <br />with solar currently under consideration for the roof of the slcating center; and <br />would be dependent on timing and overall operations that the consultant's exper- <br />tise could address in more detail. <br />Dale Street Athletic Fields <br />In staff's recominendation to defer this item from 2016 to 2018, Mr. Miller re- <br />ported that it was based on its current condition. <br />Arena Zamboni Replacement <br />Since the Zamboni was replaced in 2015, Mr. Miller advised that this was inad- <br />vertently in the 2016 schedule and should be inoved to 2025. <br />Transfers <br />Mr. Miller clarified that the three recommended transfers represented a one-time <br />shift given current trending, and with the goal of boosting funding for facilities <br />experiencing more radical funding challenges. <br />At the request of Mayor Roe, Finance Director Miler clarified the graphs — current <br />and revised — and advised that given a number of moving pieces, the graphs <br />showing revised funding level projections represented more than just those six <br />staff recommendations, but also needed to include City Council conversations re- <br />garding repurposing funds for debt service and levies coming offline as opportu- <br />nities arise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.