My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1148
Roseville
>
City Council
>
City Council Ordinances
>
1100
>
ord_1148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 8:43:21 AM
Creation date
12/3/2004 7:53:13 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Ordinance #
1148
Ordinance Title
An ordinance requiring a permit and assessment of fees for the placement of micro cells and pico cells or other forms of transmitters and receivers for the purpose of providing telephonic, telephone, telepoint, paging or similar wireless communicatio
Ordinance Date Passed
9/12/1994
Ordinance Date Published
9/20/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />D. Late PaYment Penalty <br />Fees not paid within ten (10) days after the due date <br />shall bear interest at the rate of one percent (1%) per <br />month from the date due until paid. <br /> <br />E. Acceptance of Payments <br />The acceptance of any payment required hereunder by the <br />City shall not be construed as an acknowledgment that the <br />amount paid is the correct amount due, nor shall such <br />acceptance of payment be construed as a release of any <br />claim which the City may have for additional sums due and <br />payable. <br /> <br />(1) Audit of PaYments <br />All fee payments shall be subject to audit by the <br />City and assessment or refund if the payment is <br />found to be in error. <br /> <br />(2) Incorrect PaYment Penalty <br />In the event that such audit results in an <br />assessment by an additional payment to the City, <br />such additional payment may be subject to interest <br />at the rate of one percent (1%) per month <br />retroactive to the date such payment should have <br />been paid, which shall be due and payable <br />immediately. <br /> <br />F. Federal, State and Local Tax Liability <br />Nothing in this Ordinance shall be construed to limit the <br />liability of the Permittee for all applicable federal, <br />state and local taxes and any other permit fees as may be <br />required by City Ordinance. <br /> <br />G. Utility Notification Requirement <br />Any holder of a Wireless Telecommunications Permit must <br />be a member of the City approved utility notification <br />system or any subsequent alert and warning system to <br />protect and locate their underground, pole and cell site <br />mounting structures. <br /> <br />SECTION 3. DEFINITIONS <br /> <br />For the purposes of this Ordinance and any Permit issued in <br />accordance herewith, the following terms, phrases, words and their <br />derivations shall have the meaning given herein unless otherwise <br />specifically provided for in this Ordinance or unless the context <br />clearly indicates otherwise or unless such meaning would be <br />inconsistent with the manifest intent of the City. Words not <br />defined shall be given their common and ordinary meaning. <br /> <br />A. Engineering Department <br />The Engineering De~artment of the City. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.