My WebLink
|
Help
|
About
|
Sign Out
Home
ord_1148
Roseville
>
City Council
>
City Council Ordinances
>
1100
>
ord_1148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 8:43:21 AM
Creation date
12/3/2004 7:53:13 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Ordinance #
1148
Ordinance Title
An ordinance requiring a permit and assessment of fees for the placement of micro cells and pico cells or other forms of transmitters and receivers for the purpose of providing telephonic, telephone, telepoint, paging or similar wireless communicatio
Ordinance Date Passed
9/12/1994
Ordinance Date Published
9/20/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />location shall have a permit issued in accordance <br />herewith. The permit number shall be permanently affixed <br />to the cell site and readable without a ladder. <br /> <br />B. Other Ordinances and Permits <br />Nothing in this Ordinance shall be construed as a <br />representation, promise or guarantee by the City that any <br />other permit or other authorization required under any <br />City Ordinance for the construction and operation of a <br />Wireless Telecommunications Syst~m shall be issued. The <br />requirements for any and all other permits as may be <br />required by any other City Ordinance shall still apply <br />and all other applicable permit fees shall still be due. <br /> <br />SECTION 6. USE OF STREETS, EASEMENTS AND POLE ATTACHMENTS <br /> <br />A. All Other Permits Required <br />Before commencing the construction of its Wireless <br />Telecommunications System in, above, over, under, across, <br />through or in any way connected with the easements, <br />streets, public ways or in public places of the City, the <br />Permittee shall first obtain the written approval of, and <br />all necessary permits from, all appropriate City <br />Agencies, including, but not limited to, the Zoning <br />Department, Department of Public Works, Department of <br />Occupational Licenses and any other City department as <br />may be appropriate. Applications for such approval shall <br />be made in the manner prescribed by each City department. <br /> <br />B. Notice Before Construction <br />Upon obtaining such written approval (Section 6A), the <br />Permittee shall give the appropriate City Agency written <br />notice within a reasonable time (not less than 30 days) <br />before any actual construction shall commence. This <br />section shall not apply for the emergency repairs of <br />damaged cell sites and backhaul network facilities. <br /> <br />C. Use of Existing Poles <br />Any person, firm or corporation who submits a request for <br />a permit in accordance herewith shall include therein <br />proposed agreements for the use of existing utility poles <br />and conduits, if applicable, with the owner(s) of such <br />facilities to be used or affected by the construction of <br />the proposed Wireless Telecommunications System, which <br />agreements shall become effective on the date of <br />execution of the permit issued in accordance herewith in <br />the event that such a person, firm or corporation is <br />issued a permit. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.