My WebLink
|
Help
|
About
|
Sign Out
Home
2015-11-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2015
>
2015-11-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2015 9:49:16 AM
Creation date
11/19/2015 9:42:10 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/24/2015
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sarndi ll Solar <br />MASTER SOLAR SERVICES AGREEMENT <br />Attachment A <br />Solar Services Agreement <br />Number: <br />Execution Date: <br />Jurisdiction (State): Minnesota <br />Utility: Xcel Energy <br />This Solar Services Agreement (as it may be amended from time to time, this "Agreement') is made <br />and entered into as of the Execution Date set forth above, between Sundial Energy or affiliate , LLC, a <br />Minnesota limited liability company (`Power Provider'), and The City of Roseville, a Minnesota municipal <br />corporation (`Purchaser'). <br />BACKGROUND <br />Power Provider desires to install one or more electricity grid -connected photovoltaic solar power <br />plants (as further defined below, each, a "Solar Power Facility' and collectively, the "Solar Power Facilities") <br />at one or more Sites (as defined below in Exhibit A). Purchaser desires to purchase from Power Provider and <br />Power Provider desires to sell to Purchaser the entire energy output of the Solar Power Facilities on the terms <br />set forth in this Agreement. <br />This Agreement is a master services agreement and each Schedule and Exhibit attached hereto is <br />subject to the terms of this Agreement. The Parties may, from time to time, execute and attach additional <br />Schedules to this Agreement to add Solar Power Facilities and/or Sites to this Agreement. <br />OPERATIVE TERMS <br />In consideration of the mutual covenants and agreements set forth in this Agreement and intending to <br />be legally bound, the Parties agree as follows: <br />Definitions. <br />For the purposes of this Agreement, the following terms shall have the following meanings: <br />"Acknowledgement Date" means, with respect to a Solar Power Facility, the "Acknowledgement Date" set <br />forth on the Certificate of Acknowledgement relating to such Solar Power Facility that has been executed and <br />delivered by Purchaser to Power Provider. <br />"Affiliate" means, when used in reference to a specified Person, any Person that directly or indirectly, through <br />one or more intermediaries, controls, is controlled by, or is under common control with the specified Person. <br />"Blended Energv Rate" or "Blended Rate" — A metric used to define all electrical charges in $/kwh. Includes <br />all charges on the utility invoices. To determine the average blended rate take the sum of all gross utility <br />invoices — in dollars - for a given year and divide by the total kwh usage for the same time period. <br />"Capacity Credit" or "Solar Capacitv Credit" or "Solar Credit'— A credit given to electrical utility customers <br />who install a solar PV system greater than 100kw on their property. This is not a rebate but is a payment for <br />benefits provided by the solar system to the local utility. For Xcel Energy customers this appears as a line item <br />credit each month on their electric bill. <br />"Certificate of Acknowledgement" means, with respect to a Solar Power Facility, the certificate of an <br />authorized representative of Purchaser acknowledging that such Solar Power Facility is in Commercial <br />Operation. <br />"Code" means the Internal Revenue Code of 1986, as amended."Commercial Operation" means, with respect <br />to a Solar Power Facility, the condition existing when (i) such Solar Power Facility is mechanically complete <br />
The URL can be used to link to this page
Your browser does not support the video tag.