Laserfiche WebLink
d) Partial Dumps: $50.00 per miss <br />Partial Dumps would be defined as a report by a resident that <br />their recycling cart was not fully emptied, and the recyclables <br />were not over -packed into the cart. <br />e) Throwing or Dropping Carts: $50.00 per incident <br />For each witnessed report of a driver throwing rather than <br />placing, the curbside recycling container or deliberately <br />dropping the container when the bottom of the container is <br />more than four feet above the ground. <br />f) Failure to Collect Material on a Block: $500.00 per <br />incident <br />For each incident of the Contractor failing to pick up material <br />on a block. A missed block is defined as one side of a street <br />between cross streets or an entire cul-de-sac where residents <br />from at least three households on that street report that they <br />had their material out before 7:00 a.m., the material was not <br />picked up, the recyclables were properly sorted, and the <br />addresses did not appear on the Contractor's conveyance <br />sheets as "Late Set Outs." <br />g) Failure to Collect an Entire Zone: $1,000 per incident <br />For each incident of failure to complete collection of a <br />collection zone on its designated day as defined in Exhibit A <br />when the Contractor has not received an extension of <br />collection hours from the Recycling Coordinator or <br />designated alternate. <br />h) Failure to Complete a Majority (50%) of the Collection <br />District: $2,500 for each incident. <br />i) Failure to clean up material spilled by Contractor within <br />six (6) hours of verbal or written notification: $250 each <br />incident <br />35 <br />