Laserfiche WebLink
6. Metering. <br />(a) Power Provider shall provide, at its expense, metering equipment to measure all sales of <br />Electric Power to Purchaser hereunder. The metering equipment for each Solar Power Facility shall be located <br />at the point(s) set forth on the applicable Schedule and shall meet or exceed the standards applicable to meters <br />approved for use by electric utilities in the Jurisdiction. Data retrieved from any such meter shall be delivered to <br />Purchaser and shall serve as the basis for invoicing Purchaser for all delivered Electric Power. Purchaser may, <br />at its own expense, install metering facilities on Purchaser's side of the Point(s) of Delivery. <br />(b) Power Provider's metering equipment shall be sealed and the seals shall be broken only upon <br />occasions when the meters are to be inspected, tested or adjusted by Power Provider. Power Provider shall own <br />the metering equipment that is used to measure sales hereunder, and shall be the only Party authorized to cause <br />seals to be broken on such meters. Representatives of Purchaser shall be offered a reasonable opportunity to be <br />present upon any occasion when the seals for such meters are to be broken. All testing of metering equipment <br />shall be conducted by Power Provider, its Affiliate or agent. Power Provider may, from time to time , test the <br />metering equipment for accuracy, at Power Provider's expense. At Purchaser's request, Power Provider will test <br />the metering equipment, provided, however, if the metering equipment is found to be registering within two <br />percent (2%) of the amount of Electric Power actually being delivered, the cost of such test shall be paid for by <br />Purchaser. <br />(c) If any test of the metering of a Solar Power Facility establishes that the metering equipment is <br />not accurate, Power Provider shall repair, replace or adjust the metering equipment at Power Provider's expense <br />and shall make an appropriate adjustment in Purchaser's billing, for the entire period of inaccuracy of the meter <br />measured from the date that the inaccuracy began, provided, such period shall not exceed one (1) year from the <br />date such inaccuracy is determined. If such date cannot be determined to the reasonable satisfaction of both <br />Parties, the billing adjustment shall be made for the last one-half of the period (not to exceed one (1) year) <br />between the date of the last prior successful meter test and the date of the current test disclosing the inaccuracy. <br />(d) If either Party believes that there has been a meter failure or interruption, it shall immediately <br />notify the other Party and in any event, to be effective and trigger the adjustment procedure in this Section 6(d), <br />such notice must be delivered to the other Party no later than one (1) year after such failure or interruption. <br />Should a meter be determined to have failed to operate at any time, the quantities of Electric Power to be billed <br />for such period of meter failure will be equal to the average monthly quantity of Electric Power provided by <br />Power Provider to Purchaser that was subject to such meter during the twelve (12) months preceding such failure <br />or interruption, or for the entire period the Solar Power Facility generating such Electric Power has been in <br />Commercial Operation if the period preceding such failure or interruption is less than twelve (12) months. <br />Contract Term; Early Termination by Power Provider. <br />(a) This Agreement shall be effective as of the Execution Date and shall remain in effect, unless <br />sooner terminated in accordance with its terms, until the expiration of the Contract Term as outlined in Exhibit <br />C. <br />(b) Notwithstanding anything to the contrary set forth in this Agreement, Power Provider shall <br />have the right, but not the obligation, to terminate this Agreement prior to expiration of the Contract Term at any <br />time upon the occurrence of any of the following: <br />(i) an unstayed order of a court or administrative agency having the effect of subjecting <br />the sales of Electric Power to federal or state regulation of prices and/or service, <br />(ii) a change in any law, rule or regulation that results or could result in a material adverse <br />change in the financial benefits accruing to Power Provider under this Agreement and the Parties are unable, <br />after good faith negotiations, to agree upon modifications to the terms of this Agreement acceptable to both <br />parties, <br />Page 9 of 30 <br />SE PPA 11/11/15 <br />