My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01704
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1700-1799
>
pf_01704
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 2:12:12 PM
Creation date
1/27/2016 2:23:26 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1704
Planning Files - Type
Variance
Address
2545 Hamline Ave N
Project Name
Rosepointe
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />� <br />� <br />303.1 Continued. <br />3�0-7 <br />Pipe and other aeces�ories shall, unle�s othertiaise direeted by the <br />Engineer� be unloaded at the point of delivery, hauled to and <br />distributed at the site of the project by the Contractor. They shall <br />at all times be handled Kith care to avoid damage. <br />The Contractor shall be responsible for all material furnished by him . <br />� and he shall replace at his own expense all such material that is found <br />to be defective in manufacture or that has become damaged in handling <br />after delivery by the manufacturer. This shall include the furnishing <br />� of all material and labor required fqr the replacement of installed <br />material discovered defective prior to the final acceptance of the <br />Work. <br />� <br />i <br />r <br />�,J <br />�� <br />,- <br />�` <br />�_ <br />� <br />� <br />� <br />� <br />L:� <br />� <br />� <br />The Contractor�s responsibility for material furnished by the Ouner <br />shall begin at the point of delivery by the manufacturer, ar Owner, and <br />upon aeceptance of the material by the Contraetor. The Contraetor <br />shall examine all material furnished by the Oamer at the ti�e and place <br />� of delivery, and shall reject all defective material. • <br />Any material furnished by the Ocrner that becomes damaged after <br />acceptance by the Contractor, shall be replaced by the Conrractor at <br />his oWn expense. <br />The'Contractor shall be responsible for the safe storage of material <br />fur�ished by or to .iim� and aceepted hy him, and intended for the work <br />until it has been in�:orporated in the completed project. <br />303.200 Removals. Trench Excavatio� a�d Hackfill and Restoration <br />Rer��val of existing facilities, trench excavation and backFill �nd <br />restoratio� shall be iz� accordance with the provisions of SectfQn <br />600 of these spacifications. <br />�03.300 Watermain Piae Lavinrr O��rations <br />No d�v�..�•�on frocn the required line or grade <br />will be allo�ed except with the consent af the Engineer. <br />Trench excavation and aedding preparations shal'. proceed ahead of pipe <br />placement as will p�rmit proper placement and ioi.ning oP the pipe and <br />fittings at the prescribed Qrade and �lignment uithout unnecessary <br />hindrance. �very re�aonable precautian shall be taken to prevent <br />foreign materials from ent�ring the pipe while it is being pla�ed <br />in the line. Tt�e watermain cnaterials �hall be car�fully lowered <br />inCo laying position by the use of suitable re3training devices. <br />llnder no circumstances shall the pipe be d ropped or dumped into <br />rhe trench, <br />Hefore being lowered into laying position� the Cantractor shall make a <br />thorough visual inspection of each pipe section and appurtenant unit3 <br />Co detect damaqe, Corei�n matter needinP, removal or un:�aund condition� <br />
The URL can be used to link to this page
Your browser does not support the video tag.