Laserfiche WebLink
� <br />,�� <br />,� <br />� <br />.J <br />603.200 Continued. 60Q-5 <br />of compactor is dependent on the type of backfill material <br />used. Precautionary measures should be taken to asaure that <br />the compaction equipment Will not damage the underlying pipe. <br />(4) Eackfilling shall not take place at any time unless approved <br />compaction equipment is available at Lhe site. <br />Ledge rock� boulders and large stones shall be removed to provide a <br />clearance of at least six inches below outside barrel of the pipe, or <br />fittings, and to a clear Nidth of six inches on each side of all pipe <br />and appurtenances for pipe 16 i.nches or les9 in diameter; for pipes <br />larger than 16 inches, a clearance of 9 inches beloN and clear wid th of <br />9 inchea on each side of inside diameter of pipe shall be provided. <br />Adequate clearance for properly jointing pipe laid in roek trenehes <br />shall be provided at bell holes. <br />Excavations beloa subgrade in rock <br />subgrade Nith material approved by <br />�� and thoroughly compacted. <br />or in boulders shall be refflled to <br />the Engineer or his representative <br />��. <br />Where trench excavation is encountered Nhich is unsuitable for <br />� backfill, such material ahall be replaced with granular backfill to be <br />supplied by the Contractor at the direction of the Engineer. <br />� <br />� <br />Where pipes are of sufficient size Co create an excess of backfill <br />oaterial� the excess shall be hauled to a location if directed by the <br />En�ineer and this location shall not be beyo�d the Roseville City <br />limits. Hauling and g�adin& of the �xces9 backfill will be considered <br />incfdental to the projeet. <br />Any d�t'iciency in Che quantity of material f'or backf�llins the trenches <br />� or for �'illing depressions cauaed by settleaent shall be aupplied b <br />the Contractor with no extra compensation alloued, Any settleoent y <br />which occur3 bithin one yea� after final acceptance shall be refilled <br />by the Contractor with material supplied at the Contractor's expense <br />and uiLh material approved by the Engineer. <br />�, <br />� <br />� <br />� <br />� <br />Backfill in trenches on sLree�.s shall be placed to an elevaLfon that <br />uill permft the placement of base material and surfacing material. <br />